Page 122 - ANC22-Presentations-Weds
P. 122
Flat grade-tonnage curve highlights the significant higher-grade
component – providing the project with development optionality
550 2.5
499
500
450 435 1.9 1.9 2.0
1.8 1.8
400 1.6 1.7 1.7
350 339 1.4 1.5 1.6
1.3 1.4 1.5
300 1.1 1.2 1.3 Grade (NiEq %)
Mass (Mt) 250 235 0.9 1.0 1.0 1.0
200
0.7 0.8
150 0.5 0.6 157
0.5 108
100 79 0.5
63
52 44
50 38 33 29 26 23 20 18 16 15 13 12 11 10
0 0.0
0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10 1.15 1.20 1.25 1.30 1.35 1.40
Cut-off Grade (NiEq%)
Tonnes NiEq % 29

