Page 376 - ANC22-Presentations-Weds
P. 376
Kolosori DSO Nickel Project
Mineral Resource Es,mate of 6.02Mt at 1.52% Ni (1.2% Ni cut-off) 1
• Around 200 holes drilled in 2021 to increase the
confidence category in the resource.
• Measured and Indicated Resources increased by 27%.
• 49% of resource is measured and indicated.
• High conversion of inferred into measured and
indicated resource.
• Extension of resource – explora4on target of 1.94 to
3.19 mt at 1.2% to 1.6% Ni 2
1. ASX Announcement 29 September– Updated Kolosori JORC Resource.
2. This Target range reflects a poten4al quan4ty and grade for Kolosori and is conceptual in nature only as there has been insufficient explora4on
to es4mate a Mineral Resource. It is uncertain if further explora4on will result in the es4ma4on of a Mineral Resource. ASX:PNM 7

