Page 18 - pd306-July22-mag-web_Neat
P. 18

MINING SOLUTIONS






                  Unlock the full potential of your resource with world class mining solutions.
                  We offer a range of technology driven solutions from exploration to production
                  which leverage our unique capabilities in geophysics, structural geology,
                  geochemistry, complex fluids, and digital modelling - to help you deliver mineral
                  discoveries, sustainable low cost mining and efficient project delivery.


                  Schlumberger is a project and technology   How We Can Help
                  company with over 96 years of history in
                  providing customised products and service   Carbon Capture and Sequestration
                  excellence for the resources sector.      Supporting clients with their climate change
                                                            goals by delivering over 50 Carbon Capture                                                           Schlumberger successfully custom     “Our people are
                  Operating for 20 years in Australia, and right   and Sequestration projects worldwide.                       Trenchless Construction
                  here in Perth we are providing mining services                                                               Schlumberger advisory brings deep   designs a carbon dioxide, corrosion   working with
                  on technically challenging mining projects with   Underground Mining                                         experience in trenchless construction   resistant cement Evercrete to withstand
                  turn-key solutions for resource development                                                                  for complex infrastructure in rail,   high levels of magnesium in brine and   customers globally
                  supported by digital solutions.           Assisting a tier 2 miner to develop and implement                  utilities, marine and energy industries.  soil temperatures of 113 degC.
                                                            a complex block cave mining model. Schlumberger                                                                                            to optimise asset
                  With exploration budgets reaching a record   digital expertise was sought out to develop a digital           We provided advisory services for   Dewatering Solutions
                  of AUD 1.9B in 2021, successful emerging   twin of the mining operation to drive efficient and               a complex infrastructure project   An Indonesian mine was having        performance and
                  mining companies need to be innovative    safe mining operations.                                            in New Zealand to overcome their   a challenging time replacing their   sustainability by
                  and focussed to make exciting new mineral                                                                    challenges with drilling to move   conventional industrial pumps which
                  discoveries whilst navigating shortages in   Our feasibility study unlocked value for mine                   forward during construction.      failed 2 to 6 weeks due to the inability   combining deep
                  drilling rigs. Along with customised solutions   expansion with faster underground construction                                                to handle high temperatures. The      domain knowledge
                  for your geophysical analysis, drilling needs   opportunity and AUD 150M reduction in capital cost.          Custom Fluids                     remote location of the site required
                  and digital modelling, we offer a range of   Cloud Based Analytics                                           An open pit mine site in PNG was   the Indonesian Airforce to fly them in.  and data science
                  tools and technologies, including real time                                                                  struggling with the long-term
                  seismic, XRD and XRF mineral analysis at our   Our digital team are assisting clients starting with          durability of cement in the stressed   Our high temperature rated electric   expertise with
                  laboratory in Jandakot.                   a blank sheet of paper to map out their operations                 bond zone of ground anchors       submersible pumps (ESP) arrived,      advanced AI and
                                                            with a full cloud-based analytics tool.                                                              installed, and commissioned safely
                                                                                                                               at the interface with aggressive   within 5 days, saving about AUD 2M
                                                            Innovative Drilling                                                soil conditions.                  per year on replacement costs of one   digital solutions.”

                                                            A mine expansion in Papua New Guinea (PNG) is                      The mine comprises a high wall    conventional pump.                    Schlumberger
                                                            currently limited by the speed at which the ore body               design, 200 to 300 m high in a section
                                                            can be cooled to a safe temperature for mining.                    of the existing open pit within the   Schlumberger develops latest REDA
                                                            Schlumberger provides a customised drilling                        caldera of a recently extinct volcano.  Permanent Magnet Motor (PMM)
                                                            solution which mitigates the issue.                                                                  for bore pumps with proven energy
                                                                                                                               The sloping pit wall will comprise   savings of 25% and a significant   Thank you for reading our article.
                                                            “A big well done to everyone involved in the                       of 675 “permanent” post tensioned   reduction in carbon foot print. PMMs   We look forward to working together
                                                            drilling program - the demonstration of proof                      ground anchors, 60 m deep at 30°   are capable of delivering flows of   to achieve your goals.
                                                            of concept for drilling long lateral wells. This                   in the mine wall.                 up to 300 L/s and 900 kW power.
                                                            type of drilling has never been done before,
                                                            and some thought it was not achievable.”                                                             Our digital team successfully develops
                                                                                                                                                                 a coordinated automated water data
                                                            Confidential Client                                                                                  management system.

                       Devi, Haitham, Meretta, Adam, Kurt
                       and Gabriela warmly welcome you



                                                                                                                               CONTACT US   Level 5 Telethon Avenue, Perth 6000 WA   E: kdavey@slb.com   P: +61 8 6208 3622   www.slb.com
   13   14   15   16   17   18   19   20   21   22   23