Page 78 - pd297-Sept21-mag-web
P. 78

DRILL BITS                                                                  bostech.com.au
       ReGIonAL RoUnDUPExploring together for success



       Poseidon prepares for               from 72m), 36m @ 1.3 g/t from 30m (in-  lowed  the  company’s  reporting  of  assays
                                           cluding 11m @ 3 g/t from 55m) and 9m @
                                                                                from its recent diamond programme at the
       maiden resource                     1.8 g/t from 75m.                    Leinster nickel project.
                                             Big Sky is positioned along the gold cor-  Best results included 8m @ 0.45% nickel
        Poseidon Nickel Ltd has wrapped up re-  ridor south-west of the Lena and Break of   from 19m, 5m @ 0.3% nickel from 66m, 4m
       source  definition  drilling  at  Golden  Swan   Day deposits. Gold mineralisation remains   @ 0.3% nickel from 80m and 7m @ 0.4%
       ahead of this month’s maiden resource an-  open to the south and down-dip where RC   nickel from 52m across the Woodwind, Per-
       nouncement.                         drilling is continuing.              cussion, Brass and Firefly prospects.
        Assays continue to  return good  widths   “The continuity of the broad near-surface   Downhole  EM  surveys  have  also  been
       and grade, including some very high-grade   gold mineralisation intersected to date is   completed on all holes, with two conductive
       intervals which are expected to bulk up the   very encouraging and demonstrates we   targets identified at Woodwind and Brass.
       tonnes in the mineralised zone.     are  onto  a  large  gold  system  at  Big  Sky   These are expected to be drill-tested immi-
        Some of the best intercepts from the drill-  with  the  potential  to  deliver  a  significant   nently.
       ing campaign at Golden Swan include 0.8m   near-surface resource,” Musgrave manag-
       @ 14.3% nickel from 178.85m, 2.95m @   ing director Rob Waugh said.
       4.46% from 166.85m and 3.95m @ 5.1%   Assays for more than 57 RC holes from   Rox joins the link to
       nickel from 168m (including 0.7m @ 11.9%   Big Sky are pending. Diamond and aircore   higher grades
       from 168.45m). Another hit containing 5.7m   drilling at West Island and Austin North –
       @ 5.96% nickel from 202.3m (including   under a JV with Evolution Mining Ltd – is   Rox Resources Ltd’s drilling of near-mine
       0.62m @ 8.46% from 202.75m and 2.06m   continuing.                       prospects  at  Youanmi  continues  to  deliver
       @ 7.78% from 204.5m including 0.5m @                                     high-grade gold.
       13.7% from 205.9m) was also returned.                                     Assays from four RC holes drilled at the
        Drilling has now shifted to the Southern   Drill results are music      project in May returned hits of 17m @ 5.14 g/t
       Terrace prospect where the company is   to Auroch’s ears                 gold from 151m (including 11m @ 7 g/t from
       chasing more Golden Swan-style minerali-                                 156m) at Link, 9m @ 4.57 g/t from 148m at
       sation.                               Auroch Minerals Ltd has started diamond   Junction and 2m @ 10.02 g/t from 268m at
        The Silver Swan reserve upgrade drilling   drilling Nepean Deeps in a bid to test for pos-  Youanmi South.
       programme was also expected to kick off at   sible  extensions  to  the  known  high-grade   Rox  managing  director  Alex  Passmore
       the time of print and is designed to increase   nickel sulphide mineralisation below historic   said the high-grade results would contribute
       the high-grade nickel mining inventory   mine workings at its Nepean project.  to further resource growth at Youanmi, about
       across the broader Black Swan project.  The  first  holes  into  Nepean  Deeps  fol-  480km north-east of Perth.
       Big Sky potential for

       Musgrave at Cue

        Big Sky, part of Musgrave Minerals Ltd’s
       Cue  project,  is  shaping  as  a  significant
       large-scale gold system after RC drilling
       returned more near-surface mineralisation
       within the prospective 2.6km long corridor.
        Assays from 35 recent RC holes con-
       firmed  consistent,  near-surface  gold  min-
       eralisation. New intersections include 18m
       @ 2 g/t gold from 18m, 18m @ 1.2 g/t from
       18m, 24m @ 1.7 g/t from 24m and 30m @
       1 g/t from 30m.
        Re-assaying of 1m samples from origi-
       nal composites also returned 73m @ 1.4    Auroch continues to churn out impressive exploration results from its nickel portfolio
       g/t gold from 41m (including 5m @ 10.1 g/t















         Exploring together for success







       Page 78   SePTeMBeR 2021    aUSTRaLIa’S PaYDIRT
   73   74   75   76   77   78   79   80   81   82   83