Page 40 - pd279-Feb20-mag-web_Neat
P. 40

BATTERY MINERALS PREVIEW





          Boots on



             ground



            now for



       tomorrow’s



               nickel




          attery demand has not had a big im-
      Bpact on nickel sulphide supply yet but
       when the time does arrive miners may not
       have to look far from Western Australia to
       secure the base metal.
        While stainless steel remains the pri-
       mary market for nickel, Neometals Ltd
       managing director Chris Reed is already
       preparing for a change in dynamics.
        “We’re in nickel but it is for exposure
       in  a  couple  years’  time  when  a  signifi-
       cant part of it is driven by the growth in
       batteries. It is a bit like lithium 10 years
       ago; we were in at Mt Marion but battery
       production was probably about 30% of                                                             Chris Reed
       demand,” reed told Paydirt.
        “I am thinking battery demand for   build a plant, there are options there for
       nickel is about 10-20%, but now battery   third-party treatment so you can develop
       demand for lithium will be 60%. You still   them  as  the  market  justifies  it,”  Reed   dirt in most mineral commodities; it is
       have those base world applications and   said.                           mined, can be treated and you can make
       that is great because it soaks up units. It   Equally as measured and patient in the   a profit,” Wilson told Paydirt. “It certainly
       is the same thing with cobalt; it is a non-  nickel space is Legend Mining Ltd.  doesn’t surprise or disappoint me be-
       magnetic mineral, so you have the tradi-  While it may be some time before   cause it is what it is.”
       tional applications in aerospace and it is   Legend proves it has the next best thing   The  climatic  conditions  in  the  Fraser
       pretty much non-substitutable and you   to IGO Ltd’s Nova, managing director   Range  at the time of  print  meant there
       have more of it demanded in the batter-  Mark Wilson has the backing to stay the   was no pressure on Legend to keep on
       ies.”                               course at the Rockford project in the   drilling, giving the company time to build
        Neometals drilled at the Mt Edwards   Fraser Range.                     a 3D model from findings in the structural
       nickel project, 90km south of Kalgoorlie,   The  recently  renamed  Mawson  dis-  report carried out on Mawson.
       up until Christmas and was expecting as-  covery, previously known as Area D, has   “After 6-7 weeks we still don’t know the
       says to filter through at the time of print.  been  confirmed  with  Legend  reporting   answer as to what we’ve got until we do
        Results from RC drilling at the Widg-  assays of 70.15m @ 0.52% nickel, 0.36%   that 3D model and then go out and test it,
       ie South Trend received late last year   copper, 0.03% cobalt from 88.2m, includ-  that’s the nature of the game. You have
       included 16m @ 1.45% nickel, includ-  ing 14.9m @ 1.07% nickel, 0.75% copper,   to  go  step  by  step  in  a  very structured
       ing 2m @ 4.79%, 5m @ 1.81%, 21m @   0.06% cobalt from 114m, including 2.1m   manner and maintain your discipline be-
       1.05%, including 4m @ 2.42% and 7m @   @ 2.03% nickel, 1.34% copper, 0.11%   cause that is the way you get it right and
       1.37%, including 3m @ 2.39%.        cobalt from 115.5m in hole  KDD007 in   avoid chasing red herrings,” Wilson said.
        “The nickel is pretty good and we have   January.                        “That 3D model will use a lot of this
       a good resource base there with 11 re-  “The naysayers will be saying they are   structural information and it will become
       sources. We are just starting the pre-  a bit skinny because Nova goes 1.9%   pretty obvious to us where we drill our
       liminary evaluation on a couple of those   nickel and 1% copper and this grade with   next holes and that drilling campaign will
       deposits, all of them will work at certain   the disseminated is only 0.5% and 0.3%   be scheduled to kick off later this quar-
       prices. We are getting it ready for a cou-  copper. What I point out to people is that   ter.”
       ple  of  years’  time  but  we  don’t  have  a   if you multiply the metals values out you   In the meantime, Wilson accepts that
       gun against our head, in terms of when   end up with an intercept that across the   day  traders  will  float  in  and  out  of  the
       it needs to be on-line. We don’t need to   70m is going $US105/t and that is pay-  stock, but knows that true believers – IGO



       Page 40   FeBRUaRY 2020   aUSTRaLIa’S PaYDIRT
   35   36   37   38   39   40   41   42   43   44   45