Page 448 - NEWGEN21-Proceedings-Full
P. 448

Resources and Reserves









              Resource                 Million Metric                                           Au Ounces
           Classification                    Tons                 Au Grade (g/t)                  (x1000)

               Measured                      122.4                       0.41                       1,630
               Indicated                     288.3                       0.36                       3,355                       Measured, Indicated, and Inferred
          Total Measured                     410.7                       0.38                       4,985                       Resources contained within the US$

             + Indicated                                                                                                        1,500 oz Au “Resource Pit”,



                Inferred                     136.6                       0.32                      1,388





               Reserve                Million         Grade           Contained                Recoverable
               Category               Tonnes         (Au g/t)         Gold (Koz)                Gold (Koz)                      Mineral Reserves are estimated within the

                Proven                    53            0.52                866                      650                        final designed pit which is based on the
                                                                                                                                $1,225 /oz pit shell with a gold price of
               Probable                   63            0.47                962                      722
                                                                                                                                $1,300 /oz. The minimum cut-off grade was
             Proven and                                                                                                         0.24 g/t gold. Average life of mine costs are

               Probable                  116            0.49              1,828                     1,372                       $2.42/tonne mining, $4.10/tonne processing,

                                                                                                                                and $1.99/tonne processed G&A.









                                                                                                                                                                                          29
   443   444   445   446   447   448   449   450   451   452   453