Page 53 - pd290-Feb21-mag-web
P. 53

the Yamarna gold mine’s power capacity   Local  partners  and  technology,  such  as   Site managers can now closely monitor ma-
         and plant output, as well as reduce costs.  remote body cameras, helped ensure that   chine and operator productivity, prevent truck
           WA Mines and Petroleum Minister Hon   installation and training stayed on schedule.  strut damage from overloading, reduce tyre
         Bill Johnston MLA commended Gold Road   Hexagon vice-president of autonomous   wear and achieve better fuel consumption to
         and Gold Fields for adopting these innova-  mining Andrew Crose said a willingness to   significantly reduce overall running costs.
         tive new technologies.              embrace change was key to the successful   One of the EarthTrack system’s key features
           “Western Australia is leading the way in   installation.               is that it alerts the operator of an uneven distri-
         deploying renewable energy systems in the   “Tarkwa staff’s willingness to adapt to   bution, allowing them to take immediate action
         resources industry, which is further support-  the limitations imposed by COVID-19 was   to avoid strut damage.
         ing our global  reputation as an  innovative   hugely important,” he said. “The resource-  RCT account manager Scott Phillips said
         mining jurisdiction,” he said.      fulness displayed by everyone involved was   the system maximises efficiency and produc-
                                             impressive. It ensured that we completed the   tivity of mining fleets.
         Experience gives Boart              project with minimal delays – almost to the   ator’s ability to load dirt in an effective manner
                                                                                    “This solution enhances the excavator oper-
                                             original project dates.”
         the edge in the US                                                       that  ensures  optimal  loading  conditions  with

           Boart Longyear Ltd has been contracted to   Silver Lake stays on track   every bucket,” he said.
         undertake a 5,000m RC drilling programme   thanks to RCT
         for Reidel Resources Ltd at the Kingman gold-                            CIMIC offloads 50%
         silver project in Arizona, US.        Silver Lake Resources Ltd’s earthmoving   of Thiess
           The upcoming drilling campaign is expected   fleet  now  boasts  RCT’s  EarthTrack  smart
         to test a number of areas where high-grade gold   technology information monitoring tool.  CIMIC Group has finalised its 50% sell-
         and silver was mined between the 1880s and   RCT  recently  commissioned  the  Earth-  down in mining services provider Thiess to
         1940s, as well as where further high grades   Track payload management system on a   Elliott Advisors (UK) Ltd.
         were intersected at shallow depths by Reidel in   mixed fleet consisting of five Cat 777F dump   The  sale  was  valued  at  $US4.3  billion
         late 2019.                          trucks,  one  Hitachi  1200-6  excavator  and   and generated about $US2.2 billion in cash
           Drilling was due to begin at the time of print,   one Hitachi 1900-6 Excavator.  proceeds for CIMIC, which retains the other
         pending completion of the permitting process   The solution provides Silver Lake’s ma-  50% of the Thiess business.
         and rig mobilisation.               chine operators with real-time information   Elliott is one of the oldest fund managers
           The fully funded programme is also expected   about payload distribution and optimal load   of its kind under continuous operation and
         to test new areas such as Jim’s where historic   weights at its Mount Monger operations in   manages  more  than  $US40  billion  in  as-
         mining and more recent geophysics has high-  Western Australia’s Goldfields.  sets, including equity positions in private and
         lighted its prospectivity.                                               listed companies, in Australia and globally.
           Boart Longyear was appointed by Reidel due                               Thiess delivers open cut and underground
         to its extensive drilling experience in the US.                          mining  in  Australia,  Asia,  Africa  and  the
                                                                                  Americas, providing services to 25 projects
         Safety first for Gold Fields                                             across a range of commodities. It has a di-
                                                                                  verse fleet of plant and equipment of more
         in Ghana                                                                 than 2,200 assets, a team of around 14,000
                                                                                  employees and generates annual revenues
           More  than  220  vehicles  at  Gold  Fields                            in excess of US$4.1 billion.
         Ltd’s Tarkwa mine in Ghana have been                                       CIMIC  Group  executive  chairman
         equipped with Hexagon’s MineProtect colli-                               Marcelino Fernández Verdes said: “The sale
         sion avoidance system (CAS).                                             agreement reflects Thiess’ ongoing strate-
           Despite pandemic lockdowns preventing                                  gic importance as a core activity for CIMIC.
         Hexagon’s South African-based staff travel-                              It capitalises on the robust outlook for the
         ling to Ghana, MineProtect’s operator alert-  The earthmoving fleet at Silver Lake’s   mining sector and, together with Elliott, we
         ness system, personal alert and tracking   Mt Monger operations now feature RCT’s   will pursue market opportunities in line with
         radar were installed with minimal delays.  EarthTrack payload management system  Thiess’ growth and diversification strategy.”





















         + 27 (0)11 028 1181  info@nucleusml.co.za   www.nucleusml.co.za



                                                                                 aUSTRaLIa’S PaYDIRT   FeBRUaRY 2021    Page 53
   48   49   50   51   52   53   54   55   56   57   58