East Cooee – a new system
East Trough Long Projection East Cooee – H/W – Cross Section
• Historical WMC drilling is interpreted to have
clipped the prospective channel/trough setting – so
plunge is open
• DHTEM and follow up diamond drilling to target any 8
off-hole plate(s) 8