AM6 Feasibility
▪ Feasibility study
- Very advanced
- Improved mill recoveries from recent metallurgical
work
- Ore reserve 2.1mt @ 2.2% for 47kt nickel
- Integration into the Odysseus production schedule
- Increase mill capacity to 1.1Mtpa
▪ Mining
- Accessed from existing decline
- Utilises Odysseus shaft for ore haulage
- Utilises Odysseus return ventilation circuit and
dedicated fresh air intake
- LHOS and paste fill
- Top down-centre out mining sequence
26