Odysseus hoisting shaft leg 1 raise bore breakthrough






           ▪     Completed length of 630m, 5.7m diam –
                 no issues



           ▪     Laser survey completed indicating  that
                 shaft verticality is within the 200mm

                 tolerance


           ▪     LIDAR survey commenced (3-D hole)


           ▪     Leg 2 pilot drilling to commence early

                 November


           ▪     Shaft commissioning 2               nd  Q CY23