Page 44 - SMEC SA Planning and Traffic Engineering Portfolio
P. 44

HOME         THE TEAM        OUR SKILLS     PROJECTS      ADDED SERVICES



     OUR PROJECTS
                                                                                         Detailed Public Transport Plan for the Inner City
   South Africa
                                                                                         and Outer Ring Area
   Detailed Public Transport Plan
   for the Inner City and Outer                                                          Project Type : Public Transport Plan
   Ring Area                                                                             Key Components : Integrating the Transport System
   Rea Vaya BRT NMT Facilities                                                                          Integrating transport and Land Use
                                                                                                        Integrating Transport and other planning
   City of Tshwane NMT Strategy                                                                         Integrating across levels of planning
                                                                                         Client Name                  eThekwini Municipality
   Drakenstein CITP
                                                                                         Country                         South Africa
   Development of a Strategic                                                            Start Date                      2018
   Corridor Plan for the N2 Corridor                                                     Finish Date                    2020

   Schoemanskloof Vissim Model
                                                                                         The purpose of the project is to prepare and undertake a detailed public
                                                                                         transport study for the Inner City, Outer Ring and Warwick Node. The
   Traffic Impact Study of Line 2B
   City of Tshwane                                                                       project is to align with proposed IPTN plans and provide a phased
                                                                                         implementation strategy over 20 years. The study will also include the
   Cato Ridge Transport Model                                                            development of a concept design for the Warwick junction, the largest
                                                                                         public transport hub in the city of Durban.
   GRRIN Scenario Fare Testing
                                                                                         Professional Staff provided :   Professional Staff provided :
   Relocation of Richard’s Bay Airport                                                   Project Manager             Public Transport Planning
                                                                                         Traffic and Transport Engineer  Public Transport Survey
   Rwanda                                                                                Technical Specialist        Facility Concept Design
   Australia                                                                                                         Micro simulation Modelling
   39   40   41   42   43   44   45   46   47   48   49