                                                                                         Drakenstein CITP
   South Africa

   Detailed Public Transport Plan
   for the Inner City and Outer Ring                                                     Project Type : Integrated Transport Plan
   Area
                                                                                         Client Name                  Johannesburg Development Agency
   Rea Vaya BRT NMT Facilities                                                           Country                         South Africa
                                                                                         Start Date                      2013
   City of Tshwane NMT Strategy                                                          Finish Date                    2014
   Drakenstein CITP                                                                      The project entailed the prepration of thee Drakenstein Comprehensive Transport
                                                                                         Plan (CITP) to serve the municipality for the period 2020 to 2025. It was also
   Development of a Strategic                                                            requested that a transport modelling component be present, accompanying the
   Corridor Plan for the N2 Corridor                                                     CITP document.
                                                                                         Innovation Used :
   Schoemanskloof Vissim Model
                                                                                        Aside from the 500+ page document which was submitted, the Vissim micro-
                                                                                        simulation model spans the majority of the major intersections in Paarl and
   Traffic Impact Study of Line 2B
   City of Tshwane                                                                      Wellington. The model is made up of approximately 255km of roads and 68
                                                                                        intersection, of which 29 are stop-controlled, 3 are roundabouts and 36 are
   Cato Ridge Transport Model                                                           signalised intersections. This model also includes 48 feeder intersections in-
                                                                                        between major intersections, to ensure volumes are accurately represented. All of
   GRRIN Scenario Fare Testing                                                          the intersections were also built and analysed in isolation using SIDRA Intersection
                                                                                        software.
   Relocation of Richard’s Bay Airport                                                   Professional Staff provided :   Professional Staff provided :
   Rwanda                                                                                Project Manager             Traffic Engineering
                                                                                         Traffic and Transport Engineer  Transport Modelling
   Australia                                                                             Technical Specialist        Transport Planning