                                     LANDSIDE INFRASTRUCTURE & ROADWAYS


                                     Strategic improvements provide vital access to the Port


                                     Located at a key juncture in Northern          critical infrastructure project, the Fy e Grade
                                     California’s Tier 1 Highway Freight and Rail   Separation. This $13 million project will replace
                                     Network and the federal ship channel, the      an existing at-grade rail crossing that sits
          PORT OF STOCKTON           Port sits nestled between Interstate 5 and     at the entrance to the Port’s West Complex,
          West Complex               Highway 99, as well as State Route 4           improving safety and schedule e ciency.
                                     and 580, providing direct connections to       There are currently over 3,066 trucks and cars
                                     regional and inter-regional networks. This     entering the West Complex each day. This
          Providing an e ective      dynamic  and active  location drives the       grade separation will completely eliminate the
          roadway network within     Port every day to plan and implement           truck and vehicle delays, saving thousands of
          the Port property is       transportation infrastructure and roadway      annual idling hours.
          critical to operations     improvements  that  will  sustain  operations
          and a high priority.       into the future.                               The Port of Stockton’s near-term multi-modal
          From road and bridge
          widening projects to rail                                                 infrastructure improvement plan is tactical
          grade separations, the     With the 2018 completion of Navy Drive and     and deliberate including replacing the single
          Port is working towards    Navy Drive Bridge widening to four lanes,      rail bridge, widening Washington Street, and
          improved mobility and      the Port can leverage productivity, e ciency   rehabilitating nine miles of internal roads.
          e ciency every day.        and reliability of daily operations along its   Each project lays the critical foundation
                                     internal roadway network to continue to        needed for the Port to continue achieving
                                     prepare for ongoing infrastructure growth.     success and realizing its vision.
                                     With this key corridor project completed, the
                                     Port has shifted attention towards another