Page 146 - Lecture Notes DCC3113
P. 146
FEEDBACK ON EXERCISE 10
1. Describe briefly THREE (3) purposes of road maintenance.
(3 marks)
i. To ensure the durability of road.
_____________________________________________________________________________________
ii. To maintain the usage for the traffic user.
_____________________________________________________________________________________
iii. To improve the traffic system operation.
_____________________________________________________________________________________
_____________________________________________________________________________________
2. Explain in details the reconstruction techniques for flexible pavement
(5 marks)
2 categorized : Full and Partial reconstruction
_____________________________________________________________________________________
Partial reconstruction : needed when pavement layers (except subgrade) have lost their stability and strength
_____________________________________________________________________________________
If the failure of the road base is too extensive , recycling of the surfacing usually carried out
_____________________________________________________________________________________
The surface and road base are pulverized, additional aggregate or stabilizers may be added & laid as a new road
_____________________________________________________________________________________
base
_____________________________________________________________________________________
Removal and rebuilding of all or part of the pavement using new material & construction specification
_____________________________________________________________________________________
3. Match the correct return period and its activities of routine operation maintenance below.
139

