Page 5 - Under The Roof Avonside Group staff newsletter - June 2019
P. 5

UNDER THE ROOF




            to learn and can influence people’s performance.
                To reduce their carbon footprint throughout the
            project, the Cobsen-Davies team took measures to cut
            the number of vehicle movements by maximising bulk
            deliveries and engaging labour in Portsmouth so that
            workers were local to the site. They also complied fully
            with the Main Contractor’s waste management plan.

            SAFE AND SOUND
            Safety was maintained by using trained and competent
            labour. Risk Assessment and Method Statements
            (RAMS) were issued to the Main Contractor for
            approval, and the operatives were subsequently
            inducted into the RAMS. Operatives were made aware
            of what potential risks were on the project and how
            works were to be planned and carried out. The
            health-and-safety process and risk management were
            monitored by a combination of the Charge Hand, the
            Main Contractor’s Site Manager, and Avonside’s visiting
            Construction Management personnel.




            Avonside Midlands’ Single Ply Roofing


            for KFC



            AVONSIDE MIDLANDS WERE ASKED BY CLIENT B&K        GET YOURSELVES ORGANISED!
            BUILDING SERVICES TO INSTALL A RENOLIT WHITE      As the retail park was a large-scale project and site, the
            PVC MEMBRANE SINGLE PLY SYSTEM ONTO A NEW         Avonside Midlands team made sure to organise their
            KFC RESTAURANT AS PART OF A LARGER NEW BUILD      material delivery times so that they were coordinated
            SCHEME IN WHICH LOTS OF RETAIL UNITS WERE         with other trades’ delivery programmes.
            BEING BUILT FOR GROVEBURY RETAIL PARK IN
            LEIGHTON BUZZARD.                                 AN EYE ON THE ENVIRONMENT
            —                                                 The RENOLIT ALKORBRIGHT PVC Single Ply system that
            With a total square meterage of 450m², the KFC    was installed contained a white photovoltaic
            restaurant was the only building to have a flat roof in   membrane which, being solar-reflective, reflected the
            the entire retail park.                           sunlight, creating eco-friendly sustainable energy.
                Led again by Project Lead Matthew Savage, the    Avonside Midlands also took care to minimise
            RENOLIT ALKORBRIGHT membrane was mechanically     waste when it came to off-cut materials.
            fastened by Avonside Midlands operatives. The
            thickness of the membrane was 1.5mm, whilst the
            finish was a brilliant white.
                Fixfast Ltd provided the fixings that were used
            throughout the project. Other products that were used
            included Xtratherm insulation and Firth Steels’ S5+
            metal decking.

            TEAMWORK
            Collaboration and strong communication were needed
            as Avonside Midlands’ staff were required to work
            closely with the cladding Contractor of the project.
            They also met regularly with the design team on-site.






       www.avonsidegroup.co.uk
   1   2   3   4   5   6   7   8   9   10