Page 46 - Facility Management (All Chapter)
P. 46

FACILITES DESIGN FOR VARIOUS FACILITIES FUNCTION












                            To understand waste, it is important to recognize it first. Waste can be defined

                     as any resource that adds cost but does not add value to the product. The following
                     are the most common sources of waste in a manufacturing facility:

                     1.     Equipment

                            Equipment  can  be  underutilized  for  many  reasons.  Some  reasons  are  poor
                     scheduling methods, inadequate maintenance programs, absence of feedback mech-
                     anisms to report maintenance problems, inadequate spare parts inventory, operators
                     not  trained  in  the  use  of  equipment  and  in  basic  preventive  maintenance,  inefficient
                     product design, long setup times and inefficient setup procedures, and large lot sizes.


                     2.     Inventories
                            Inventories for raw material, components, parts, work-in-progress, and finished
                     products are usually wasted for the following reasons: large purchasing and production

                     lot sizes, poor facility layout, inefficient material handling systems, inefficient packaging
                     systems,  inadequate training for the  workers, poor  organization,  too  many suppliers,
                     centralized  warehouses,  inefficient  product  design,  lack  of  standardization,  awkward
                     storage and retrieval systems, and poor inventory control systems.


                     3.     Space
                            Space is another key resource where waste can be identified by excess inven-
                     tory,  inappropriate  facility  layout,  inadequate  building  design,  unnecessary  material

                     handling, inefficient storage systems, and inefficient product design.

                     4.     Time
                            Time  can  be  wasted  due  to  excessive  waiting  or  delays  due  to  inefficient
                     scheduling,  machine  downtimes,  long  repair  times,  poor-quality  products,  unreliable

                     suppliers,  poor  facility  layout,  and  inefficient  material  handling  systems,  deficient
                     inventory control systems, large lot sizes, and long setup times.

                     BPLK                                    46                            DMQ 40392
   41   42   43   44   45   46   47   48   49   50   51