Page 22 - Unit2.docx
P. 22
a2,3 0.9 0.82*2 0.45 0.203*2 520 390
c2,4 0.9 0.82*2 2.35 2.823*2 520 390
c2,3 0.9 0.82*2 0.45 0.203*2 520 390
b2,4 0.9 0 2.35 2.823*2 520 390
b2,3 0.9 0 0.45 0.203*2 520 390
∑ 6.48 22.253
Q/n M r / ∑ r 2 zi M r / ∑ r 2 xi P i
z xi
x zi
PILE
r )/22.253 (
r )/ 6.48
k N ( 520⋅ zi 390* xi k N
a2 227 58 54 227-58-54 = 205** Minimum load 205 KN, carried by pile
a2
a2 29 54 227-29-54 = 244
a3 29 54 227+29-54 = 282
a4 58 54 227+58-54 = 222
b2 58 0 227-58-00 = 257
227-29-00 = 257
0
29
b2
© It's Engg. Life
b3 29 0 227+29-00 = 236
b4 58 0 227+58-00 = 275
c2 58 54 227+58-54 = 222
c2 29 54 227-29+54 = 252
c3 29 54 227+29+54=290
c4 58 54 227+58+54 = 329*** Maximum load 329 KN, carried by
pile c4
Example 3.2
A pile trestle shown on figure 3-3 consists of four vertical piles surmounted by a
2.2m thick pile cap. It carries a horizontal load applied to the surface of the cap
of 400kN. The only vertical load exerted on the pile group is the weight of the pile
cup. Determine the loads on the piles.