2.2 Local or imported projects
The project of the KNX installation must be contained in the database for commissioning
purposes. If the project has been configured on a different PC, there are two possibilities:
The first option is to import the exported project with ETS onto the commissioning PC. The
necessary steps are described in the “Project design” chapter. It is however necessary to
ensure that all additional installed programs e.g. for touch panels are also installed on the
commissioning PC.