Page 31 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 31

SECTION 4.0 – ARCHITECTURAL DESIGN GUIDELINES                                                                          SECTION 4.0 – ARCHITECTURAL DESIGN GUIDELINES



                        4.13.20  All hose reels for firefighting shall be  compartmentalised  with sufficient                                  4.15.2    The  successful  tenderer  shall  arrange  factory/showroom  visits  prior  to
                                  space for easy access and usage. Such compartments shall not encroach                                                  producing and selecting materials, equipment and/or furniture.
                                  into circulation areas.  Floor traps shall be provided inside the
                                  compartments for maintenance purposes.                                                                       4.15.3    The approved samples  of all finishes,  fittings, and accessories shall be
                                                                                                                                                         appropriately mounted on sample boards with labels and shall be placed at
                        4.13.21  Stainless steel grease trap system shall be installed in all kitchen areas,                                             the site office for reference.
                                  food processing and food preparation areas, and other areas necessary.

                        4.13.22  For air-conditioned  spaces where condensation will  likely  occur,  the
                                  temperature and humidity shall comply with the JKR Guidelines on The
                                  Prevention of Mould Growth in Buildings.

                        4.13.23  Air-conditioned condenser units and other exposed mechanical services
                                  such as cooling tower  etc., where installed, shall be located
                                  inconspicuously in an orderly manner, well ventilated, and protected from
                                  direct sunlight.

                        4.13.24  The successful tenderer shall install sub-meters of primary water usage
                                  such as irrigation, cooling towers at every block, or tenant to monitor water
                                  usage and leaks detection. For energy monitoring purposes, sub-meters for
                                  electrical, water, and gases shall be provided at strategic locations (refer to
                                  M&E Works Brief).

                        4.13.25  Luminaries  fittings  shall  be  recessed  to  reduce  dust  collection,  ease  of
                                  cleaning, and maintenance.


                        4.14      MAINTENANCE

                        4.14.1    Considerations  for ease of  maintenance, servicing, and cleaning works
                                  shall be emphasised on all building designs.

                        4.14.2    An area for the maintenance office shall be provided and easily accessible.

                        4.14.3    All windows and doors, ceiling, fittings (including M&E fittings and curtains),
                                  architecture features, etc. at a considerable high level shall be provided with
                                  an appropriate pre-planned mechanism or fixed structures  for easy
                                  maintenance and cleaning purposes such as built-in  motorised devices,
                                  scissor-lift/man-lift, catwalks, cat ladders, etc.


                        4.15      SAMPLES AND MOCK-UPS

                        4.15.1    The successful tenderer shall set up mock-ups and submit samples of all
                                  finishes, fittings, and accessories complete with colour  scheme, where
                                  applicable, for PD's concurrence before actual installations.



                                                                                                        22                                                                                                                     23
                        2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT                    2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   26   27   28   29   30   31   32   33   34   35   36