                        SECTION 5.0: ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES                                                          5.1.8     All building materials and fittings, which are of metal such as ironmongery,
                                                                                                                                                         roof, etc., shall be rust-proof,  or otherwise, alternative non-metallic
                                                                                                                                                         materials may also be used.
                        5.1      GENERAL
                                                                                                                                               5.1.9     Use of locally manufactured products shall be encouraged throughout the
                        5.1.1     Architectural components, materials, and finishes used for the building shall                                          project in accordance with the current government circulars.
                                  follow respective categories as stated specifically in the Garis Panduan Dan
                                  Peraturan Bagi Perancangan Bangunan Oleh Jawatankuasa Standard Dan                                           5.1.10    Any paints, coatings, primers, and adhesives, when used for internal areas,
                                  Kos, Unit Perancang Ekonomi (EPU), Jabatan Perdana Menteri (2015 or                                                    shall be water-based and  the  Permissible Exposure Level (PEL) to
                                  latest edition) and other acts and regulations.                                                                        formaldehyde or any carcinogen as adopted by OSHA.

                        5.1.2     Types of finishes shall not be inferior to the standards given and shall be of                               5.1.11    All materials shall follow the minimum requirements specified in the latest
                                  the highest quality within the approved category and subject to the PD’s                                               JKR Standard Specification of Building  Works or unless otherwise
                                  concurrence. Finishes proposed for all building elements  shall suit the                                               specified.
                                  buildings/rooms’ intended functions and benefit the project requirements.
                                                                                                                                               5.1.12    A detailed schedule of internal and external finishes for walls, floors, and
                        5.1.3     Materials and construction methods in a coastal environment or close to                                                ceiling shall be drawn up and submitted as part of the proposal in the form
                                  water body should be resistant to flood and wind damage, wind-driven rain,                                             of all room layouts with elevations on all sides as shown in Appendix 2 –
                                  corrosion,  moisture,  and  decay  (i.e.,  due  to  sunlight,  aging,  insects,                                        Schedule of Accommodation and Finishes. The specification shall only
                                  chemicals, temperature, or other factors) and shall comply with current:                                               be indicative and not exhaustive.

                                  a)  Garis Panduan Perancangan Pemuliharan  dan Pembangunan
                                     Kawasan Sensitif Alam Sekitar PLANMalaysia.                                                               5.2       ROOF COMPONENTS

                                  b)  Guidelines on Physical Development Planning for Island and Marine                                        5.2.1     The roof design and materials shall have absolute water tightness. The
                                     Parks PLANMalaysia.                                                                                                 method of installation,  fixing, and fastening of  roofing  materials,  caps,
                                                                                                                                                         flashings, insulation, and expansion joints, whenever required, shall strictly
                                  c)  Garis Panduan Pembangunan Persisiran Pantai JKR.                                                                   conform to the manufacturer’s specification and installation method.

                        5.1.4     Finishes proposed by the tenderer other than those specified shall be of                                     5.2.2     All roofing works and heat insulation specifications shall comply with the
                                  equivalent  high  grade  locally  manufactured  unless  otherwise  specified                                           latest JKR Standards Specification for Building Works.
                                  building materials and subject to the PD’s concurrence.
                                                                                                                                               5.2.3     All roof designs must have complete protection from birds, bats, rodents,
                        5.1.5     Size, texture, colour, pattern, and other subjective aspects of materials and                                          etc., from entering the roof space. Exposed trusses and parapet walls shall
                                  finishes shall be subjected to interaction and the PD’s concurrence.                                                   be avoided, and soffits shall be provided to all the roof eaves.

                        5.1.6     Anti-termite  treatment  shall be carried out above and underground                                          5.2.4     All roofs shall have minimum width overhang as below:
                                  designated areas to floor before construction following the manufacturer’s
                                  instruction by a licensed applicator specified in the latest JKR Standards                                             a)  Building: 1500 mm.
                                  Specification for Building Works.
                                                                                                                                                         b)  Canopy and awning: 1200 mm.
                        5.1.7     The successful tenderer shall provide a five (5) years warranty from the
                                  date of Practical Completion (CPC) against any termite attack to the works                                             c)  External corridor: 1500 mm.
                                  that may arise due to any defect, fault, or ineffective anti-termite treatment.
                                  The terms and conditions of the warranty shall be to the PD’s concurrence.                                   5.2.5     The reinforced concrete flat roof design is not allowed. If unavoidable, a
                                                                                                                                                         reinforced concrete flat roof shall be designed with double roofing where




                                                                                                        24                                                                                                                     25
                        2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT                    2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   28   29   30   31   32   33   34   35   36   37   38