Page 36 - Combat Aircraft (January 2020)
P. 36

INDUSTRY REPORT // USAF ADAIR

                                                           altitudes up to 50,000ft. The contracted   meet the requirement. Four of them
                                                           aircraft must be compatible with captive   were selected as the primes under the
                            The 2014                       air-to-air training missiles, electronic   $6.4-billion contract.

                            disbandment                    countermeasures pods and infra-red   The adversary contractors
                                                           search and track (IRST), and around half
                  of the 65th Aggressor                    will require a radar with a range of up to   ATAC is now part of Textron Airborne
                                                                                          Solutions. In anticipation of the USAF
                                                           80nm (148km).
                                                            Only US-based companies were
                  Squadron, which fl ew                     permitted to bid as prime contractors   requirement it procured former
                                                                                          French Air Force Mirage F1CR/CTs and
                  F-15C/Ds at Nellis AFB,                  and the aircraft will be   own by American   F1Bs, which began arriving at its new
                                                           civilians. However, the aircraft can be
                                                                                          Adversary Center of Excellence (ATAC-
                  Nevada, is seen as                       sourced from western nations or from   ACE) in June 2017. It acquired 63 F1s from
                                                           ‘threat countries’. All of this was deemed to
                                                                                          France, along with support equipment
                  something of a watershed                 be achievable despite a relatively modest   and 150 engines. This facility at Fort
                  moment in this story                     cost per   ight hour (CPFH).   Worth Alliance Airport, Texas, is where
                                                            The solicitation set the wheels in motion
                                                                                          it performs maintenance, repair and
                                                           for the leading ADAIR contenders to   overhaul work on the 80 jets operated
                                                           start lining up new   eets of aircraft to   by the company. The company carried



































































          36  January 2020 // www.Key.Aero




                                                                                                                  21/11/2019   20:58
        32-37 Contact aggressors C.indd   36
        32-37 Contact aggressors C.indd   36                                                                      21/11/2019   20:58
   31   32   33   34   35   36   37   38   39   40   41