Drilling – 2010
• 9 holes for 943m
• Drilling stopped just prior to Presidential Elections
• Intersected mineralization over 300m width
300m Key to Gold Grades
<0.20g/t
0.20 – 0.50g/t
0.50 – 1.0g/t
0.50 – 1.00g/t
60m
>1.00g/t
TSXV MAU Montage Gold Corp.