Drilling – 2013
• 43 holes for 3,340m
• Completed coverage of the anomaly
• Confirmed significant widths
• First met test work on RC chips
230m Key to Gold Grades
<0.20g/t
0.20 – 0.50g/t
0.50 – 1.0g/t
0.50 – 1.00g/t
>1.00g/t
65m
TSXV MAU Montage Gold Corp.