Page 396 - NEWGEN21-Proceedings-Full
P. 396
Drilling – 2018
• 2 x core holes for metallurgical test work
• 11,677m 100m x 50m Resource RC drilling to -200m
October 2018 Inferred
Mineral Resource
Statement
Cut off Mt Au g/t Au Koz
0.2 92.9 0.66 1,971
0.3 77.7 0.74 1,849
0.4 64.1 0.83 1,711
Block Model Key
October 2018 MIK blocks shown 0.5 52.5 0.91 1,536
sized based on the proportion of the
block above a 0.2g/t cut-off grade.
0.6 42.2 1.0 1,357
<0.20g/t
0.20 – 0.40g/t
0.40 – 0.75g/t 0.7 33.3 1.1 1,178
0.75 – 1.20g/t
>1.20g/t 0.8 26.0 1.2 1,003
TSXV MAU Montage Gold Corp.

