Page 465 - NEWGEN21-Proceedings-Full
P. 465
Growth of the System
On the 12th of March 2019, Greatland entered into a farm-in agreement with
2019 Havieron Joint Venture Newcrest, with drilling subsequently commencing at Havieron on the 22nd May 2019.
❑ Early drilling sought to define the extent of the mineralisation along
strike and test the system to a depth of 1,000 m below surface.
❑ Newcrest extended Greatland's hole HAD006 from 838m to 1216m,
and successfully identified higher grade mineralisation at depth, with
mineralisation observed over 700 m in vertical extent.
❑ Detail in the geometry of the Havieron mineralisation emerged early –
HAD010 drilled less than 50m to the southeast of the main complex
and HAD006, failed to intersect significant mineralisation.
Section Line 7597650mN as published 24 October 2019 Newcrest Quarterly Exploration Report for the three months ended 30 September 2019.

