Page 685 - The City and Guilds Textbook: Plumbing Book 1 for the Level 3 Apprenticeship (9189), Level 2 Technical Certificate (8202) and Level 2 Diploma (6035)
P. 685

Index

                   storage cisterns  277–80          protecting public  18–19       cyanide  21
                   supply  261–9                     responsibilities  219–21       cylinders
                   testing  328                      visitors  206                     grades of  369
                collapsing cavity fixings  132    Construction Skills Certification    insulating  368–9
                combination boilers  382–3, 437, 459       Scheme (CSCS) card  218     see also hot water systems
                combined cooling, heat and power   consumer units  652–3            Data Protection Act 2018  211
                        (CCHP)  628               continuity testing  660–1         dead leg  387
                combined heat and power (CHP)     contract of employment  209       de-alloying  156
                        627–8                     contractors  11, 14               decommissioning  142
                combined primary storage unit  384  contractor’s certificate  611      central heating systems  515–16
                combustion  58–9                  contracts manager  202               cold water systems  340–3
                commissioning  141                Control of Asbestos Regulations      guttering systems  544–5
                   cold water systems  330–1               2006  9                     hot water systems  427–8
                   hot water systems  420, 424–7  Control of Lead at Work Regulations   sanitary systems  612–14
                   sanitary systems  606–9                 2002  8–9                decorators  204
                communication                     Control of Substances Hazardous   degradation of plastics  158
                   customer  217–18                        to Health (COSHH)        delegation  223
                   verbal  213–14                          Regulations 2002  2, 5–6  delivery note  207
                   written  208–9, 212            convection  170                   delivery of materials  223
                competent persons  7              cookers, Aga-type  456            density
                composite valves  400–1           copper, origin of  151               common conductors  188
                compression fittings  99–100, 103,   copper nails  130                 gases  623–4
                        109, 110                  copper tube                          kerosene  162
                compressive strength  154            20 thread  328                    water  160
                concealed cables  46                 bending  90–8                  deposition  168
                condensation  167                    clipping distances  128        dermatitis  615
                condensing boilers  458, 460–1       conduction  169                designers  11
                conductance  185                     fittings  98–104               dew point  460
                conduction  169–70                   jointing  97–104               de-zincification  156
                conductivity  155                    pipe clips  126–8              digital thermometers  167
                   electrical  188                   red band  328                  direct current (DC)  187, 644–5
                conductors  169                      testing  139                   Distribution Network Operator
                   density of  188                core drills  91                            (DNO)  651
                   insulation resistance  661–2   corrosion  151, 155–7, 370        district heating installations  163,
                   size of  654                      preventing  159, 480–2                  436, 505, 627
                conduit  653–4                    corrosive substances  21          documentation
                Confined Spaces Regulations 1997  9  countersunk screw  131            company policies and procedures
                confined spaces, working in  72–4  couplings  103, 108                       209
                conflicts  215–17                 craft operatives  203–4              customer care  208–9
                connectors  103–4                 crimping  88                         on-site  206–10
                Construction (Design and          cross-connection, preventing  310–11  Domestic Building Services
                        Management) (CDM)         current  183, 185–7                        Compliance Guide  352–3
                        Regulations 2015  10      customer                          domestic clients  11
                construction site                    care charter  208              domestic installations  118–29
                   documentation  206–10             handover  142, 209             drain valves  475
                   inspectors  204–6                 information  209               drain-off valves  313
                   job roles  200–4                  liaison  118–19                draught  464–6
                   management team  197–201          service  119                   dress code  209
                   perimeter fencing  18          cuts  35–6                        drill bits  88–9
                                                                                                                673





        9781510416482.indb   673                                                                                    29/03/19   9:09 PM
   680   681   682   683   684   685   686   687   688   689   690