Page 688 - The City and Guilds Textbook: Plumbing Book 1 for the Level 3 Apprenticeship (9189), Level 2 Technical Certificate (8202) and Level 2 Diploma (6035)
P. 688

The City & Guilds Textbook: Plumbing Book 1

                HETAS (Heating Equipment Testing     statutory regulations  346–53     positioning pipework  126–9,
                        and Approval Scheme)         storage cylinders  368–9,               135–7
                        631                                376–80                      preparation  119–24
                high-density polyethylene (HDPE)     testing  420–4                    pre-testing checks  139
                        109                          thermal stores  383–4             private houses  118–29
                high-necked pillar taps  316         thermostatic mixing valves        protecting surroundings  138
                hole saws  90                              (TMVs)  407–11, 413         second fix  134
                horseplay  3                         tundish arrangements  400–1       shower mixing valves  414–19
                hose union bib taps  316             unvented  372–80, 387, 401–6      snagging  134
                hot water systems                 hot work  52–8                       temperatures  408, 412
                   centralised  356–86            hydraulic bending machine  105       testing  139–40
                   cold water accumulators  379–  hydraulic low carbon steel bending   instantaneous water heaters  381–2,
                        80                                 machines  87                      384
                   combination boilers  382–3     hydrochloric acid  21             insulation
                   combined primary storage unit    ice  167–8                         cisterns  288–9
                        384                       ideal mechanical advantage (IMA)     hot water pipework  413
                   commissioning  420, 424–7               178                      insulation resistance  661–2
                   components  392–3              immersion heaters  360–1, 412,    integral solder ring  98, 103
                   decommissioning  427–8                  428                      invoices  208
                   discharge pipework  400–5      imperial units  148               iron  151
                   efficiency  405                improvement notice  15            irritant substances  21
                   energy efficiency  354         in situ working  137–8            isolating electricity supply  49–51,
                   expansion vessels  396–400,    individual conciliation  216               659–64
                        475–6, 503                                                  isolation valves  311–13
                   factors affecting  353–5       induced siphonage  584–5          jig saw  87
                                                  infrared thermometers  167
                   faults  428–9                                                    job roles  200–4
                   flow rate  423                 injuries                          job specifications  206, 223
                   flushing  422–3                   acute  31                      joiners  204
                   functional controls  395–401      chronic  31                    jointing
                   initial system fill  421–2        eyes  28–9                        capillary fittings  98–9
                   installation  411–20              major  38–42                      compounds  108
                   instantaneous heaters  381–3,     minor  35–8                       compression fittings  99–100,
                        384                          reporting  6, 42–3                      103, 109, 110
                   insulation  413                   see also accidents; first aid     copper tube  97–104
                   localised  386–7               in-line strainer  396                fittings  107–8
                   manufacturer’s technical       inspectors  204–6                    low carbon steel pipe  107–9
                        instructions  353         installations                        plastic pipe  110–11, 112–17
                   noise in  429                     benchmarking  141                 press-fit fittings  101–2, 103
                   open vented  356–72, 384, 389,    Building Regulations compliance    push-fit fittings  100–1, 103,
                        407                                141                               110, 112–15, 117
                   overheating  429                  central heating systems  506–10   solvent weld joint  114, 116
                   renewable energy supply  357      commissioning  141                threaded joints  107
                   safety  406–11                    decommissioning  142           joists, notching and drilling  121–3
                   safety controls  393–5            final fix  134                 junction boxes  656–7
                   secondary circulation  387–92,    first fix  133–4               kelvin scale  166–7
                        424                          handover to customer  142      kerosene  162, 625, 632–4
                   selecting  355                    hot water systems  411–20      kick-space heaters  471
                   solar thermal  384–6              making good  124–5             kinetic energy  165

                676





        9781510416482.indb   676                                                                                    29/03/19   9:09 PM
   683   684   685   686   687   688   689   690   691   692   693