Page 123 - Quality Manual_Web_Neat
P. 123

QAP 120






                                    Inspection & Test Status


                 a.  PURPOSE

                      The purpose of this procedure is to ensure that product status in terms of inspection
                      and  testing  is identified  throughout production  so as  to prevent  inadvertent use  or
                      unqualified further processing.

                 b.  SCOPE OF APPLICATION
                      The application of this procedure applies to all products used by that affect product
                      quality.

                 c.  DEFINITIONS
                      None

                 d.   CROSS REFERENCE
                          Quality manual, clause d.12

                          Quality planning – QAP 20
                          Process control – QAP 90
                          Inspection and testing – QAP 100

                 e.   RESPONSIBILITY FOR APPLICATION
                      The project engineer is responsible for the application of this procedure.

                 f.  PROCESS
                     f.1   The inspection and test results of all products used by the company that affect
                           product quality shall be identified. This will be done by methods most suitable on
                           practicable for the product in question. Such methods may include;
                                Segregation
                                Documentation – (e.g. inspection records)

                                Marking
                                Storage labeling

                                Etc.
                      f.2  The  above  methods  of  identification  should  show  the  conformance  or  non
                           conformance of products with regard to inspections and tests performed.
                      f.3  Only products that have passed the required inspections and / or tests, or have
                           been released under positive recall procedures, or have been granted use through
                           concession my further proceed in the construction process.

                      f.4  The individual methods for achieving product inspection and test status may be
                           dictated by contractual requirements and in such cases these requirements must
                           be followed, otherwise status will be established in accordance with inspection
                           and test procedures.
                                                                                                            124
                          AL HABBAI - QUALITY MANUAL
   118   119   120   121   122   123   124   125   126   127   128