f.3  The department head / project engineer shall review and evaluate non conforming
                           product to determine the appropriate curative action to be taken. This may include:
                                 acceptance by concession with or without rework.

                                 Re-garding for alternative application
                                 Rework to meet requirements

                                 Rejection and replacement
                      f.4  Concessions regarding the supply of final product shall include consultation with
                           the customer or his representative prior to supply.  The resulting agreement must
                           be recorded and shall include the condition of the product offered and accepted
                           under concession.

                           Any product that are reworked shall be re-inspected in accordance  with defined
                           requirements / procedures.

                      f.5  In the event that a non-conformity involves a subcontractor / supplier, the person
                           handling  the  nonconformance  will  inform  the  subcontractor  report  or  letter
                           requesting  appropriate action.  All areas affected by the non-conformity shall
                           also be notified.
                      f.6  The person dealing with the non-conformance shall implement corrective action,
                           appropriate to the magnitude of the non-conformity, in accordance with customer
                           complaints, corrective and preventive action procedures.  Any internal quality
                           document changes required as a result of suggested corrective action must be
                           implemented in accordance with document and data control procedures.

                      f.7  All decisions and details of corrective action taken shall be recorded on the non
                           conformance report (including those of subcontractors / suppliers) which shall be
                           signed by the authority making that decision.  The original of all completed non
                           conformance reports must be copied to the management representative for the
                           purposes of further corrective / preventive action analysis in accordance with
                           customer complaints, corrective and preventive action procedures and review of
                           subcontractor / supplier performance in accordance with purchasing procedures.
                 g.  RECORDS

                      Product non-conformity reports will be filed by the management representative and
                      shall be retained for the contract duration plus a minimum period of three years.

                 h.  FILING
                      The master copy of this procedure shall be filled by the management representative
                      together with other procedures, under the number QAP 130.

                 I.   ATTACHMENTS
                      None:

                      - for non-conformance reports (form number QAP 170-03)
                      - Pls, refer to attachments of internal quality auditing procedure – QAP 170.

                                                        