f.3.4  Prior to hand over the site shall be cleared of all surplus materials, plant
                                  and  equipment, thoroughly cleaned and final inspections carried out a
                                  required by the contract. Where contractually required products shall be
                                  accompanied by any necessary documentation that proves the quality of
                                  the  product  or  that  specified  requirements  have  been  met  during
                                  processing.

                           f.3.5  The project engineer should ensure that all equipment manuals, as built
                                  drawings, keys and other necessary documentation are available prior to
                                  hand over. Keys should be clearly identified through labels, a schedule or
                                  by being placed in the locks.
                      f.4  Movement of materials

                           f.4.1  Produced materials will be forwarded to site store as required.
                           f.4.2  The materials will be received, inspected by either project engineer or site
                                  storekeeper against supplier delivery documents and al habbai purchase
                                  order.
                           f.4.3  Site receipt voucher will be prepared and sent to the accounts officer who
                                  shall obtain approval of GM.
                           f.4.4  In case of materials required are available at store (outside the scope of
                                  this system), then material requisition will be faxed to the storekeeper who
                                  shall arrange to release  the material via material issue voucher (MIV).
                                  Material issue voucher will be  signed  by project engineer,  storekeeper
                                  and truck driver. The MIV will be finally send to the accountant.

                           f.4.5  Site receipt voucher will be used to issue tools to the trade personnel.
                                  Transfer of materials from site to site will be made and recorded in the
                                  attached form dully signed by both sides and approved finally by the GM
                                  before being sent to the accountant.

                 f.  RECORDS

                      Material issue records are maintained in the form of purchase requisitions and delivery
                      orders  and are  maintained by  the accounts  department the  contract  duration  plus
                      minimum period of one year.
                      Delivery records shall be maintained by the project engineer for the contract duration
                      plus a minimum period of one year.

                 f.  FILING
                      The master copy of this procedure is filed by the management representative together
                      with other procedures, under the number QAP 150.