f.3.2 Whenever it is a contractual requirement that the customer and / or his
                                  representative be afforded the right to verify purchased product at the
                                  sub-contractors / suppliers premises, the arrangements for such verification
                                  and  the method  for product  release  will  be specified  in the  purchase
                                  documents.
                            f.3.3 Where specified in the contract the customer or his representative shall
                                  be allowed the right to inspect any  product procured and used by the
                                  company in fulfilling the contract requirements including those procured
                                  on behalf of sub-contractors / suppliers.

                     f.4 PURCHASING PROCESS
                            f.4.1 Material requisition will be raised by the Project Engineer and discussed
                                  during weekly meeting with the GM.
                            f.4.2 The material requisition form will be highlighted whether the material is
                                  available at main store. In case it is not available, the GM approve the
                                  requisition before being forwarded to the Purchasing Officer.
                            f.4.3 The Purchasing Officer obtains quotations as necessary, make comparison,
                                  and forward it to the GM for approval.
                            f.4.4 Purchase order will be prepared by the Purchase Officer, approved by
                                  GM. Copy of the Purchase order will be sent to the supplier and another to
                                  the  relevant Project Engineer. Details about receiving materials will be
                                  documented in QAP 150.

                            f.4.5 Petty cash of Dhs. 1000.00 is maintained by the Projects Engineers. A
                                  purchase that exceeds Dhs. 500.00 will have to be approved by the GM.
                     g.   RECORDS
                           Records of sub-contractor / supplier performance and the Approved Supplier List
                           will be maintained by the General Manager / Purchasing Officer for a minimum
                           period of three years.
                     h.   FILING

                           The  master  copy  of  this  procedure  shall  be  filed  by  the  Management
                           Representative, together with other procedures, under the number QAP 060.
                     i.   ATTACHMENTS

                              Approved Supplier List............................................................ QAP 60-01
                              Supplier Questionnaire ........................................................... QAP 60-02

                              Approved Sub-contractor List .................................................QAP 60-03
                              Local Purchase Order ............................................................. QAP 60-04

                              Material Requisition ................................................................ QAP 60-05



                                                        