Page 20 - Refman_Brochures
P. 20
S Sh hi ip py ya ar rd d P Pe er rf fo or rm ma an nc ce e
E Ev va al lu ua at ti io on n M Mo od du ul le e
R RE EF FM MA AN Nfor windows
Superintendent “rates” the
shipyard’s performance
Simple on screen form for the Superintendent
to record the “Yard Performance Evaluation”
under user defined headings.
Overall rating shown on
Yard Bid Comparison.
Ranked list based on
shipyard’s overall
performance
Based on all previous dockings, or
last “X” dockings or all dockings since
a specified date.
Overview
REFMAN’s Shipyard Performance Evaluation Module of the docking, the completed ratings are stored centrally
allows the Superintendent to "rate" a yard's performance so that an overall average rating can be produced for each
during and after a docking. Ratings can be given under shipyard. This overall average can also be shown on the
any number of user defined headings (for example, Yard Bid Comparison Report to assist in deciding which
Facilities, Services, Equipment, Response Speed, yard to nominate. You can also produce a ranked list
Cooperation, Communication, Engine Work, Steel Work, which shows yards in order of their overall average
Safety, Prices, etc.) and the Superintendent can also performance which can help in deciding which yards to
record comments to qualify these ratings. On completion invite to tender when sending a specification out.
Minitech Systems Limited. Bridle Way, off St. Vincents Close, Girton, Cambridge, CB3 0PB, U.K.
Phone: 01223 277049, e-mail: sales@minitech-systems.com, website: www.minitech-systems.com
From Outside U.K. Phone: +44 1223 277049

