Page 39 - Arebian
P. 39
39
9.2.2 Observations-Air leakages through,
Table 9.
Sr.no. Section Description
Section Production area
1 Slitter m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
2 Rewinding m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
3 Beiling m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
4 Printing m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
5 Lamination m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
6 Polish star m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
7 Pouch m/c Air leakage through FRL unit, quick release fittings, pvc
tubing, pneumatic cylinders end connectors,etc.
9.3 Observation
1. Observed heavy air leakages in the plant.
2. It’s recommended to carry out periodical compressed air leakage quantification test.
Due to above compressed air leakages, energy required for its generation is shear
wastage.
3. Hence Above mentioned air leaks to be attained on priority.
4. For healthy control on Compressed air leakages at plant a good leak prevention program
should be implemented.