Page 9 - Arebian
P. 9

9



                                                       3  PREFACE




                   We have been allotted an assignment of Walk Through/Preliminary Energy Audit at M/S.
               Arabian Flexible Packaging Industry, Dubai.
                   We  thank  you  for  the  belief  shown  in  us.  We  appreciate  the  initiative  taken  by  the
               management in energy saving.


                   Our Electrical, Mechanical and Thermal team has worked independently on both the sides.
               We  are  presenting  a  report  based  on  measured  energy  data  and  historical  data  related  to
               energy consumption collected from the plant during the audit.

                   An effort has been made to calculate specific energy consumption for material conversion
               along with assessing first level efficiencies of utility equipment like AHUs, ACs etc.

                   We  have  made  an  attempt  to  analyse  present  energy  recording  and  energy  monitoring
               system prevailing in plant and have included our comments regarding the same. We strongly
               recommend computerized EMS system communicating with strategic energy meters installed in
               the plant. This would generate timely energy data with accuracy automatically and would allow
               staff to work on energy conservation than on just logging the history. Such a system can even
               generate specific energy consumption figures on daily basis.

                   The audit team had individual experts in electrical, utility and thermal field, as such expert
               third-party evaluation of energy use was done in the plant and this report is prepared on the
               basis of this evaluation.

                   We are thankful to the  management and Maintenance team for providing a sincere and
               enthusiastic  support  to  all  the  Energy  Auditors  and  support  staff  during  the
               Audit/Measurement Phase.

                   All the key areas of concern were openly discussed and they really helped us to direct our
               efforts towards the company goals and objectives.
                   We would like to mention here that all the recommendations included in this report are
               executable at the plant  level. Exact  quantification and converting these ESOs (Energy Saving
               Opportunities) into ECM (Energy-saving measures) would require a detailed study, where ever
               mentioned.  We  also  would  like  to  state  here  that  we  possess  all  the  necessary  skills  and
               infrastructure through our own setup and with our associates, to execute the recommended
               projects and help you in achieving end results.

                   Thanking you once again and wishing you all the success in your “Save Energy Mission”.

               Team – Foster Consultants,

               Dubai, U.A.E.
   4   5   6   7   8   9   10   11   12   13   14