Policies and Procedures on Infection Control


               Step Four : Required Infection Control Precautions by Class

                                   During Construction Project         Upon Completion of Project

                  Class I   Execute work by methods to minimize raising dust.  Clean  work  area  upon
                                                                      completion of task.
                            Immediately replace a ceiling board displaced
                            for visual inspection.
                 Class II   Provide active means to prevent airborne dust  Clean work surfaces with hot
                            from dispersing into atmosphere.          water and detergent.
                            Water mist work surfaces to control dust while  Contain construction waste
                            cutting.                                  before transport in tightly
                                                                      covered containers.
                            Seal unused doors with duct tape.
                                                                      Wet mop &/or vacuum with
                            Block & seal air vents.                   HEPA-filtered vacuum before
                                                                      leaving work area.
                            Place dust matt  at entrance & exit of work area.
                                                                      Remove isolation of HVAC
                            Remove or isolate HVAC system in areas where  system in areas where work is
                            work is being performed.                  being performed.
                 Class III  Remove or isolate HVAC system where work is  Remove barriers only after work
                            being done to prevent contamination of duct  is completed & site inspection
                            system.                                   done by Project Consultant/
                                                                      Engineer.
                            Complete all critical barriers i.e. plywood, plastic
                            to seal area from non-work area.          Remove barrier materials
                                                                      carefully to minimize spreading
                            Maintain negative pressure within work site  of dirt & debris.
                            using HEPA equipped air filtration units.
                                                                      Wet mop area with hot water &
                            Contain construction waste before transport in  detergent.
                            tightly covered containers.
                                                                      Remove isolation of HVAC
                            Cover transport carts.                    system in areas where work is
                                                                      being performed.

                 Class IV   Isolate HVAC system.                      Remove barrier material
                                                                      carefully.
                            Complete all critical areas.
                                                                      Contain construction waste.
                            Maintain negative pressure within work site with
                            HEPA filters.                             Cover transport carts.

                            All personnel entering work site are required to  Vacuum work areas with HEPA-
                            wear shoe covers.Shoe covers must be removed  filtered vacuums.
                            upon exit.
                                                                      Wet mop area.
                                                                      Remove isolation of HVAC



                 156  Ministry of Health Malaysia