Page 5 - A4 Post tensioning bar 1030
P. 5

Macalloy Post Tensioning System



         Working Load Factors             gives recommended load factors  achieved by the 1030 bars, with
                                          for permanent and temporary  typical results below 3.0%.
                                          applications.
         The working load factor to be used
         in a design is at the discretion of                               Anchorage strength – anchorage
         the Engineer but will  normally be  Properties                    efficiency tests in accordance with
         that  specified  in  the  appropriate                             the requirements of ETAG 013 are
         Standard.                        Extensive data and test reports   carried out to verify that the failing
                                          on  bars  and  components  are   load in the anchorage is not less
         For     prestressed    concrete  available from Macalloy’s Technical   than 95% of the actual failing load
         construction, the current standard  Department.                   in the  parent bar or 95%  of the
         for buildings is BS8110 and for                                   specified characteristic failure load.
         bridges BS5400, which suggest  The main properties of the 1030    Anchorage testing also verifies
         an initial prestressing force of 70%  bars are summarised as follows:  that the ultimate failure occurs in
         of  the  characteristic  failing  load.                           the bar and is not influenced by the
         For ties and similar applications in  Fatigue – threaded assemblies   anchorage or coupler.
         structural steel construction, the  have a fatigue resistance in
         requirements  of  BS5950:  Parts  1  excess of two million cycles of   Stress Corrosion – Macalloy
         and 2 apply.                     loading over a tensile stress range   1030 bars have been subjected to
                                          of   590-670 N/mm ,  exceeding   the F.I.P.  standard stress corrosion
                                                          2
         Maximum prestress forces in  the requirements laid down in        test. No bars failed during the
         accordance with EN 1992-1-       ETAG 013.                        200 hour duration of the test and
         1: 2004 Eurocode 2: Design of                                     subsequent tensile tests to failure
         concrete structures, are given in  Relaxation – the requirement laid   showed no significant reduction in
         the Macalloy 1030 Post Tensioning  down in BS4486 for the loss of   the ultimate or 0.1% proof stresses.
         System    European    Technical  stress due to relaxation in a bar
         document ETA-07/0046.            loaded to 70% of its characteristic
                                          failure load, after 1000 hours
         Ground anchorage design is  at  room  temperature,  is  3.5%  NOTE: ETAG 013 approvals are
         dealt with in BS8081, which  maximum.  This is comfortably  for 1030  system only not S1030.





























                                          Millenium Bridge, London
                                          Architect - Fosters and Partners
                                          Main Contractor - Monberg Thorsen and Sir Robert McAlpine
                                          Engineer - Arups




                                                                                                                    5