Figure 5 ‐ Flow‐out vs. Flow‐in on the Production Casing
                                            Cement Job (Calculated by Panel)

                              G.     Industry Standards for Cementing

                          API RP 65 contains recommended practices focused on the drilling and
                   cementing of casings in the shallow sediments of deepwater wells in which
                   highly permeable and over‐pressured sands are found.   In connection with the
                                                                             142
                   production casing cement job on the Macondo well, BP diverged from a number
                   of API RP 65 recommended practices.

                          API RP 65 Section 7.5 provides the following guidance on preventing
                   cement from being displaced by drilling mud:

                          If casing is not to be run to bottom, the “rat hole” should be filled with a
                          higher weight mud to prevent cement from falling into the rat hole and
                          displacing rat hole fluid into the cement column, thus compromising the
                          cement’s properties.  The fluid should be of adequate density and
                          properties that there will not be a tendency for the fluid to swap with the

                          cement as it is being placed.



                   142  API RP 65 (2002).