Page 105 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 105

SECTION 9.0 – MAINTENANCE                                                                                              SECTION 9.0 – MAINTENANCE



                                  e)  Washing methods, including the frequency and method of washing                                           9.4.7     The successful tenderer shall submit a digital copy in the form of Microsoft
                                      required to maintain performance and appearance. Details shall be                                                  Word/ Excel Files (.doc/.docm/.docx)/(.xls/.xlsm/.xlsx) of the followings to
                                      provided in respect of the maximum time during which performance of                                                the PD/PD’s Representative:
                                      components  can  be  maintained,  together  with  the  frequency  and
                                      method of washing required to achieve this.                                                                        a)  Floor Layout Plan drawings (format or any other format as approved by
                                                                                                                                                            PD/PD  Representative)  using  ‘SKATA  room  naming  convention’  in
                                                                                                                                                            hardcover binding.
                        9.3       DURABILITY
                                                                                                                                                         b)  Asset information forms/templates (.xls/.xlsm/.xlsx format or any other
                                  The performance criteria shall be satisfied with the works’ full design life if                                           format as approved by  PD/PD  Representative) and List of DAK
                                  the  maintenance  has  always  been  carried  out  as  specified  by the                                                  Komponen (as  per  Borang D.A 7  in  Garis Panduan  PeDATA:  Aset
                                  successful tenderer.                                                                                                      Bangunan.


                        9.4       ASSET REGISTRATION, TAGGING, AND INVENTORY                                                                   9.5       AS-BUILT DRAWING

                        9.4.1     The successful tenderer shall implement  the tagging and labelling to                                        9.5.1     The as-built drawing shall be provided as per contract requirement.
                                  register all required asset components such as built-in and loose furniture,
                                  keys, locks, etc., and shall follow JKR’s requirement.                                                       9.5.2     The successful tenderer shall provide a complete set of hard copies and a
                                                                                                                                                         digital copy of as-built drawings to the PD/PD’s Representative for the as-
                                  a)  This shall require registration of assets, inventory documentation, and                                            built drawings registration process at Jabatan Kerja Raya  Malaysia
                                     collaboration with the client and the PD during the DLP.                                                            database.

                                  b)  All  labelling for registration of Immoveable Asset Components shall                                     9.5.3     The preparation and submission of drawings shall be as per requirement of
                                     comply with the latest JKR Standard Specification for Building Works.                                               latest Garis Panduan Pengurusan Lukisan Siap Bina and Garis Panduan
                                                                                                                                                         PeDATA: Aset Bangunan.
                        9.4.2     The successful tenderer shall identify and label (Blok, Aras dan Ruang)
                                  asset  information  as  per  requirement  of  latest  of  Garis  Panduan                                     9.5.4     The successful tenderer shall submit a digital copy in the form of AutoCAD
                                  Pengumpulan Data dan Pelabelan  Aset Tak Alih  (PeDATA):  Aset                                                         files  (.dwg),  Revit  files  (.rvt),  and  PDF  files  (.pdf)  to  the  PD/PD’s
                                  Bangunan dan Sistem Kod Aset Tak Alih (SKATA) in the drawings.                                                         Representative.

                        9.4.3     The successful tenderer shall collect and fill up asset information as per the
                                  requirement  of  Garis  Panduan  PeDATA:  Aset  Bangunan.  All  related
                                  forms/templates shall be submitted to the PD/PD’s Representative.

                        9.4.4     The  successful  tenderer  shall  supply  and  install  asset  tagging  (Daftar
                                  Premis Aset (DPA), Daftar Aset Khusus (DAK) – Peringkat Blok, Aras dan
                                  Ruang) that comply with PeDATA specification and SKATA.

                        9.4.5     The successful tenderer shall provide a complete set of hard copy together
                                  with a digital copy  to the  PD/PD’s  Representative for registration  and
                                  tagging works.

                        9.4.6     The  successful tenderer  shall  compile  the  asset  information  as  per  the
                                  requirement of the latest Garis Panduan PeDATA: Aset Bangunan.




                                                                                                        96                                                                                                                     97
                        2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT                    2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   100   101   102   103   104   105   106   107   108   109   110