Page 106 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 106

SECTION 9.0 – MAINTENANCE                                                      SECTION 9.0 – MAINTENANCE



 e)  Washing methods, including the frequency and method of washing   9.4.7   The successful tenderer shall submit a digital copy in the form of Microsoft
 required to maintain performance and appearance. Details shall be   Word/ Excel Files (.doc/.docm/.docx)/(.xls/.xlsm/.xlsx) of the followings to
 provided in respect of the maximum time during which performance of   the PD/PD’s Representative:
 components  can  be  maintained,  together  with  the  frequency  and
 method of washing required to achieve this.   a)  Floor Layout Plan drawings (format or any other format as approved by
                                     PD/PD  Representative)  using  ‘SKATA  room  naming  convention’  in
                                     hardcover binding.
 9.3   DURABILITY
                                  b)  Asset information forms/templates (.xls/.xlsm/.xlsx format or any other
    The performance criteria shall be satisfied with the works’ full design life if   format as approved by  PD/PD  Representative) and List of DAK
 the  maintenance  has  always  been  carried  out  as  specified  by the   Komponen (as  per  Borang D.A 7  in  Garis Panduan  PeDATA:  Aset
 successful tenderer.                Bangunan.


 9.4   ASSET REGISTRATION, TAGGING, AND INVENTORY    9.5   AS-BUILT DRAWING

 9.4.1   The successful tenderer shall implement  the tagging and labelling to   9.5.1   The as-built drawing shall be provided as per contract requirement.
 register all required asset components such as built-in and loose furniture,
 keys, locks, etc., and shall follow JKR’s requirement.    9.5.2   The successful tenderer shall provide a complete set of hard copies and a
                                  digital copy of as-built drawings to the PD/PD’s Representative for the as-
 a)  This shall require registration of assets, inventory documentation, and   built drawings registration process at Jabatan Kerja Raya  Malaysia
 collaboration with the client and the PD during the DLP.   database.

 b)  All  labelling for registration of Immoveable Asset Components shall   9.5.3   The preparation and submission of drawings shall be as per requirement of
 comply with the latest JKR Standard Specification for Building Works.   latest Garis Panduan Pengurusan Lukisan Siap Bina and Garis Panduan
                                  PeDATA: Aset Bangunan.
 9.4.2   The successful tenderer shall identify and label (Blok, Aras dan Ruang)
 asset  information  as  per  requirement  of  latest  of  Garis  Panduan   9.5.4   The successful tenderer shall submit a digital copy in the form of AutoCAD
 Pengumpulan Data dan Pelabelan  Aset Tak Alih  (PeDATA):  Aset   files  (.dwg),  Revit  files  (.rvt),  and  PDF  files  (.pdf)  to  the  PD/PD’s
 Bangunan dan Sistem Kod Aset Tak Alih (SKATA) in the drawings.   Representative.

 9.4.3   The successful tenderer shall collect and fill up asset information as per the
 requirement  of  Garis  Panduan  PeDATA:  Aset  Bangunan.  All  related
 forms/templates shall be submitted to the PD/PD’s Representative.

 9.4.4   The  successful  tenderer  shall  supply  and  install  asset  tagging  (Daftar
 Premis Aset (DPA), Daftar Aset Khusus (DAK) – Peringkat Blok, Aras dan
 Ruang) that comply with PeDATA specification and SKATA.

 9.4.5   The successful tenderer shall provide a complete set of hard copy together
 with a digital copy  to the  PD/PD’s  Representative for registration  and
 tagging works.

 9.4.6   The  successful tenderer  shall  compile  the  asset  information  as  per  the
 requirement of the latest Garis Panduan PeDATA: Aset Bangunan.




 96                                                                                                     97
 2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT   2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   101   102   103   104   105   106   107   108   109   110   111