Page 72 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 72

SECTION 5.0 – ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES   SECTION 5.0 – ARCHITECTURAL COMPONENTS, MATERIALS AND FINISHES




 TYPE OF PAINT          5.13.18  All colour scheme proposals must be submitted to the Client for approval
                                  and shall be forwarded to the PD’s concurrence before application on-site.
 Weather
 NO.   AREAS/ROOMS   resistant   PU/ Epoxy   Washable   5.13.19  The successful  tenderer shall submit  three  (3)  options of external and
 & anti-  paint   paint           internal colour schemes comprising a minimum of two (2) elevations (for
 fungus                           external) and complete with sample boards for the PD’s approval.

 3   Internal wall :
 Clinical & sterile   √   5.14    WATERPROOFING
 areas/room
 Example of related areas/   5.14.1     All waterproofing works  shall comply with the latest JKR Standard
 rooms:                           Specification for Building Works.
 a)  CSSD Department
 b)  Laboratories       5.14.2    Reinforced concrete flat roofs and gutters, where applicable, shall use any
 c)  Wards                        approved waterproofing.
 d)  CE rooms
 e)  Treatment Room     5.14.3    Wet area floors such as toilets, bathrooms, kitchen, ablution, and pantry,
 f)  Procedure Room               where applicable, shall use any of the following types of waterproofing:
 g)  Clean Utility
 h)  Others as stated in MBOR
 or technically required          a) Cementitious
                                  b) Crystallisation

 4   Internal wall :    5.14.4    Waterproofing  for  toilet  walls, bathrooms, ablution,  and wet areas shall
 Non-clinical areas/room   √      extend to 2100 mm to prevent dampness.
 Example of related areas/
 rooms:                 5.14.5    Damp proof course and/or waterproofing membranes shall be provided to
 a)  Areas/rooms in Office        retaining walls, basements, and all ground floor areas, especially with
 hours Department:                finishes such as vinyl, parquet, timber strip, and carpet. The damp proof
 •  Administration                course shall be provided with an  approved  waterproofing  proprietary
 Department                       system.
 •  Offices
 •  Training facilities:    5.14.6   Waterproofing membrane, wherever used, shall be turned up at the curbs,
 •  Seminar, meeting              parapets and turned into a sealing chase. Membrane collars and sleeves
 rooms etc.                       shall be provided and properly sealed at pipes  and conduit areas, per
 •  Waiting areas                 approved waterproofing proprietary system.
 •  Corridor
 •  Public areas        5.14.7    Waterproofing membrane, wherever specified, shall reflect and emit heat
 b)  Others as stated in MBOR
 or technical required            from the surface and also prevent fungus growth.

                        5.14.8    All  external  planter  boxes,  wherever  specified,  shall  be  applied  with
 5   Internal wall :              approved waterproofing complete with concealed proper drainage  outlet
 Services    √                    into the nearest perimeter drain.
 a)  Store
 b)  M&E rooms



 62                                                                                                     63
 2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT   2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   67   68   69   70   71   72   73   74   75   76   77