E-TEC Turnkey Data Centre Solutions - 81

E-TEC Power Management Ltd                                                          Case Study Summary No. 3

E-TEC works closely with clients to design, implement and support                   (Financial Sector)
complete “Best-in-Class” data centre infrastructure solutions to ensure             Project Type: Data Centre Enhancement | M25
maximum availability for facilities and critical processes. From small              Project Brief: Design, supply and install 5 No. 2.5 MVA HV diesel
computer rooms to large scale data centres, E-TEC specialises in providing          generators in bespoke acoustic enclosures, together with all associated
complete turnkey solutions involving the full integration of power supply,          control systems and equipment.
control and monitoring, physical and environmental infrastructure, network          Project Description: When originally established, the data centre was
management and monitoring, fire protection and security.                            supported by 4 No. 2.5 MVA LV generators. The decision was made to
                                                                                    extend and enhance the data centre capacity and to upgrade all support
Client Focus & Commitment                                                           services to suit; E-TEC Power Management Ltd was selected to provide
                                                                                    all aspects of the new power generation requirement. As well as new MV
E-TEC Power Management Ltd has undertaken projects across a broad and               generators, the contract included provision of an additional 60,000 litre
varied range of market sectors, with each project presenting its own unique         bulk fuel tank with all associated pipe work and controls, feeding fuel via
requirements and challenges. Our technical knowledge, combined with our             a ring main circuit to 1000 litre double skinned day tanks, located adjacent
focus and commitment to our clients, has enabled E-TEC to provide tailored          to the generating set within the acoustic enclosures.
solutions to the highest design standards. As a company we continue to grow         Design Criteria & Scope of Supply:
and develop this reputation with an ever expanding blue-chip customer base.         • Design, supply & installation of 5 No. 2.5 MVA sets powered by MTU

Case Study Summary No. 1                                                                 20V4000G23 engines, complete with switchgear & control systems
                                                                                    • Integration of the new control system with the existing generator control
(22MW Co-location Data Centre)
                                                                                         switchgear
Project Type: Full EMS & PMS Installation | London                                  • Provision of modular acoustic enclosures to achieve a specified noise

Project Brief: A complete Power Management System used to monitor the                    level of 68 dB(A) @ 1m with all sets running
incoming supplies down to final cabinet distribution and manage the critical        • Extension of the fuel farm & fuel control system to cater for the additional sets
power throughout a 22MW co-location data centre. The additional                     • There was to be absolutely zero risk of power loss to the building whilst
requirement to interface to the existing UPS Systems and Generators meant
a site wide monitoring package was required.                                             the new system was commissioned & made ‘live’
                                                                                    • Installation of complete SCADA Control System, additional MV
The Role of E-TEC: To install over 500 primary and secondary energy
monitoring power quality analysis meters throughout the data centre                      Switchgear & modifications to existing LV Switchgear
capturing power consumption, transients and events.
                                                                                    E-TEC Power Management Ltd Provides:
Scope of Supply: The data from these meters is captured via our e-Power
Energy Management Software in order to provide full visibility of site critical     • Standby Generating Systems – 20 kVA to 3 MVA +
power and energy usage 24/7. Monitoring scope consisted of:                         • Energy Management Systems
                                                                                    • Building Management Systems
• 104 Intelligent PDUs                                                              • SCADA & Remote Monitoring
• Static Transfer Switches                                                          • UPS Systems & Switchgear – 3 kVA to 2 MW +
• 12 x 4000A UPS Switchboards                                                       • LV & MV Switchgear – LV up to 6000A & MV up to 1200A
• 4 x 4000A Double Ended Package Substations                                        • Fuel Storage Supply & Control Systems
• Chillers                                                                          • Ventilation & Cooling Systems
• 68 x HV Switchgear Sections monitored across six switchboards                     • Server Rooms & Rack Systems
• 10 x 2.5 MVA Generators split across two power stations                           • Raised Flooring & Room Fit Out
                                                                                    • Data Power & Control Cabling
Case Study Summary No. 2                                                            • Energy Efficient Lighting & Variable Speed Drives
                                                                                    • Fire, Security, Access Control & Video Monitoring Systems
(Business & Financial News, Media Sector)                                           • Building Construction & Civil Works

Project Type: Generator Upgrade | London

Project Brief: Remove and relocate existing generator radiators to create
space for the new equipment. Design, supply and install 2 No. 2.5 MVA
diesel generators in bespoke acoustic enclosures, together with all
associated control systems and auxiliary equipment.

Project Description: The client appointed E-TEC to carry out the generator
upgrade works at their prestigious London data centre. E-TEC was chosen
for our specialist experience in the provision and execution of particularly
difficult projects such as this. In short, an external location on the ninth floor
was chosen for the new equipment which was already occupied with two
large cooling radiators serving the existing sets. Since the proposed location
for the new equipment was away from the central core of the building, the
weight limitation of loading allowed per square metre was dramatically less
than the proposed load to be installed. The solution was a radical design
change which saw the cooling radiators sited remotely from the engine and
suspended on steelwork from the floor above. The engine exhaust silencers
were acoustically housed and suspended in the same way. To raise the
equipment to high level prior to locating and building the generators and
associated acoustic housings in situ, extensive steel work adaptations,
temporary removals and extended crane operations were required.

Design Criteria & Scope of Supply:

• Design, supply & install 2 No. 2.5 MVA diesel generators together with
     all associated control systems & auxiliary equipment

• Bespoke acoustic enclosures designed to achieve a maximum noise level
     of 65 dB(A) @ 1m

• Generators were unable to be installed in conventional form due to a major
     weight restriction

• Project management, crane lifting, logistics & sequencing was required
     to locate the new equipment to the ninth floor

• Integration of the new E-TEC control & monitoring system with existing
     live equipment & controls

E-TEC Power Management Ltd  Tel : +44 (0) 1252 744 800

21 Hercules Way             Fax : +44 (0) 1252 744 930

Aerospace Boulevard

Farnborough          Email : uksales@e-tecpowerman.com

Hampshire GU14 6UU          Website : www.e-tecpowerman.com
   80   81   82   83   84   85   86   87   88   89   90