Page 175 - Engineering Mathematics Workbook_Final
P. 175
Probability & Statistics
+
mean value of the random process at t 68. For the function ( ) x = a bx ,
f
= 2 is __________. 0 x 1, to be a valid probability
density function, which one of the
[GATE-2017-EC-SESSION-2]
following statements is correct?
65. Assume that in a traffic junction, the (a) a = 1, b = 4 (b) a = 0.5, b = 1
cycle of the traffic signal lights is 2
minutes of green (vehicle does not (c) a = 0, b = 1 (d) a = 1, b = -1
stop) and 3 minutes of red (vehicle [GATE-2017-CE-SESSION-1]
stops). Consider that the arrival time
of vehicles at the junction is 69. For a construction project the mean
and standard deviation of the
uniformly distributed over 5 minute completion time are 200 days and 6.1
cycle. The expected waiting time (in days respectively. Assume normal
minutes) for the vehicle at the distribution and use the value of
junction is _________ standard normal deviate z = 1.64 for
the 95% confidence level. The
[GATE-2017-EE-SESSION-2] maximum time required (in days) for
the completion of the project would
66. The number of parameters in the be _____________
univariate exponential and Gaussian
distributions, respectively are [GATE-2017-CE-SESSION-2]
70. A six-face fair dice is rolled a large
(a) 2 and 2 (b) 1 and 2
number of times. The mean value of
(c) 2 and 1 (d) 1 and 1 the outcomes is _______.
[GATE-2017-ME-SESSION-1]
[GATE-2017-CE-SESSION-1]
71. A sample of 15 data is as follows 17,
67. Vehicles arriving at an intersection 18, 17, 17, 13, 18, 5, 5, 6, 7, 8, 9, 20,
from one of the approach roads 17, 3. The mode of the data is _
follow the Poisson distribution. The
mean rate of arrival is 900 vehicles (a) 4 (b) 13
per hour. If a gap is defined as the (c) 17 (d) 20
time difference between two
successive vehicle arrivals (with [GATE-2017-ME-SESSION-2]
vehicles assumed to be points), the 72. The standard deviation of linear
probability (up to four decimal dimensions P and Q are 3 m and
places) that the gap is greater than 8 4 m respectively. When assembled,
seconds is _________. the standard deviation (in m) of the
resulting linear dimension (P + Q) is
[GATE-2017-CE-SESSION-1] _______.
[GATE-2017-ME-SESSION-2]
173

