Page 118 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 118

SECTION 11.0 – REQUIREMENT OF APPROVING AUTHORITIES                                         APPENDICES



 c)  Certificate of Completion and Compliance (CCC)

    Upon satisfactory completion of the work and obtaining clearance or
 confirmation  from the  Local Authority and  the respective technical
 departments, the PSP shall issue CCC for the said project.

 d)  Fire Certificate Designated

    All designated premises must have a fire certification issued by JBPM
 as per Fire Services Act 1988. The PSP shall compile the necessary
 documents such as a copy of CCC, approved building plans, and land
 ownership for the client to submit for the fire certification.

 11.1.5   The successful tenderer shall be responsible to liaise with the relevant
 Local Authority  including other technical agencies regarding  the
 infrastructure facilities required such as water supply,  electrical power,
 telecommunication,  firefighting requirements, drainage,  sewerage,
 access  roads,  rubbish  disposal,  etc.,  and  thus  to  provide  all  the
 requirements concerning them for this project.

 11.1.6   Whenever required by the by-law or regulations, the successful tenderer
 shall be responsible to prepare and submit drawings, calculations, and/or   APPENDICES
 documents to the  relevant authorities  for approval through  the local
 practicing professionals who are registered with the relevant boards.

 11.1.7   Prior to submission to the approving authorities, the PD shall agree with
 all designs, drawings, and specifications. A copy of all correspondences
 and replies to/from the approving authorities shall be extended to the PD.

 11.1.8   The successful  tenderer shall be  responsible  to inform  the respective
 technical departments regarding the project’s development, such as the
 Town Planning Department, the Local Authorities Council, etc.



















                                                                                                  APX-01
 108                    2021 EDITION                                       HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
 2021 EDITION                                       HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT
   113   114   115   116   117   118   119   120   121   122   123