Page 13 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 13

SECTION 1.0 – GENERAL                                                                                            SECTION 2.0 – SCOPE OF WORK



                        1.3.6     All consultants must be registered with MOF and their respective boards as                                   SECTION 2.0: SCOPE OF WORKS
                                  required by the Government.

                        1.3.7     The tenderers shall submit copies of a valid certificate of registration that                                2.1       The architectural works shall consist of design, planning, preparation,
                                  indicates the name and registration date with curriculum vitae (CV) of all                                             production   of   drawings,   and    specifications.   The   subsequent
                                  appointed consultants.                                                                                                 implementation,  construction (including supervision by qualified
                                                                                                                                                         professionals),  completion,  commissioning,  handing-over  in  approved
                        1.3.8     The successful tenderer shall include in the submission  of  the  Letter of                                            condition,  and  maintenance  of  the  said  project  shall  consist  of,  but  not
                                  Intent (LOI), the Memorandum of Agreement (MOA) between the tenderer                                                   limited to the following components as specified in Appendix 1 - Project
                                  and consultants (Architect and Medical Planner), and Terms of Reference                                                Brief.
                                  (TOR) of each consultant to the government satisfaction.
                                                                                                                                               2.2       The detailed requirements for Building Works shall be laid out in the Project
                        1.3.9     Where  it  is required for  Building Information Modelling (BIM), the BIM                                              Brief. The requirements given shall be indicative, and the tenderers shall
                                  models shall be provided in accordance with the Government’s Technical                                                 include suggestions or improvements to their proposals.
                                  Requirements, Garis Panduan BIM JKR and Piawaian BIM JKR, unless
                                  otherwise specified in the BIM Project Execution Plan (BPEP) and subject                                     2.3       All information provided in the pre-bid document shall be intended to assist
                                  to the P.D.’s acceptance, minimum as follows:                                                                          the tenderers in the design and shall not be read as the only features or
                                                                                                                                                         facilities  required  and/or  constrained  to  the  design.  The  tenderers  shall
                                                           ITEM                              FORMAT                                                      understand each area’s intended purposes and functions  to satisfy the
                                                                                                                                                         Government’s requirements.
                                   Outline of BIM Project Execution Plan (BPEP)           .pdf/ .doc

                                   Coordinated Design Architectural BIM Model             .rvt & .nwc                                          2.4       The tenderers shall also be responsible with providing a complete design
                                   Spatial Analysis Report based on Architectural Model   .pdf                                                           and building facilities for each area’s proper function and efficient operation.
                                                                                                                                                         The tenderers’ failure to comply with the said requirement shall not entitle
                                   Tender drawings documentation in softcopy              .dwfx                                                          the tenderers to any additional payment and time whenever the tenderers
                                                                                                                                                         are instructed to design, build, or install such facilities.

                        1.3.10    The successful tenderer shall conduct an assessment using the green                                          2.5       The detailed scope of  works for other  facilities and services,  wherever
                                  rating tools to evaluate the level of sustainability achieved for the project in                                       applicable, shall be as mentioned in other relevant works and technical brief
                                  accordance with Surat Arahan KPKR Bil.2/2020: Pelaksanaan Penarafan                                                    of requirements in the pre-bid document.
                                  Hijau Bagi Projek Jabatan Kerja Raya Malaysia (JKR) and Garis Panduan
                                  Pelaksanaan Penarafan Hijau bagi Projek-projek JKR by Cawangan Alam
                                  Sekitar & Kecekapan Tenaga (CASKT).


























                                                                                                         4                                                                                                                      5
                        2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT                    2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT