Page 13 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 13
SECTION 1.0 – GENERAL SECTION 2.0 – SCOPE OF WORK
1.3.6 All consultants must be registered with MOF and their respective boards as SECTION 2.0: SCOPE OF WORKS
required by the Government.
1.3.7 The tenderers shall submit copies of a valid certificate of registration that 2.1 The architectural works shall consist of design, planning, preparation,
indicates the name and registration date with curriculum vitae (CV) of all production of drawings, and specifications. The subsequent
appointed consultants. implementation, construction (including supervision by qualified
professionals), completion, commissioning, handing-over in approved
1.3.8 The successful tenderer shall include in the submission of the Letter of condition, and maintenance of the said project shall consist of, but not
Intent (LOI), the Memorandum of Agreement (MOA) between the tenderer limited to the following components as specified in Appendix 1 - Project
and consultants (Architect and Medical Planner), and Terms of Reference Brief.
(TOR) of each consultant to the government satisfaction.
2.2 The detailed requirements for Building Works shall be laid out in the Project
1.3.9 Where it is required for Building Information Modelling (BIM), the BIM Brief. The requirements given shall be indicative, and the tenderers shall
models shall be provided in accordance with the Government’s Technical include suggestions or improvements to their proposals.
Requirements, Garis Panduan BIM JKR and Piawaian BIM JKR, unless
otherwise specified in the BIM Project Execution Plan (BPEP) and subject 2.3 All information provided in the pre-bid document shall be intended to assist
to the P.D.’s acceptance, minimum as follows: the tenderers in the design and shall not be read as the only features or
facilities required and/or constrained to the design. The tenderers shall
ITEM FORMAT understand each area’s intended purposes and functions to satisfy the
Government’s requirements.
Outline of BIM Project Execution Plan (BPEP) .pdf/ .doc
Coordinated Design Architectural BIM Model .rvt & .nwc 2.4 The tenderers shall also be responsible with providing a complete design
Spatial Analysis Report based on Architectural Model .pdf and building facilities for each area’s proper function and efficient operation.
The tenderers’ failure to comply with the said requirement shall not entitle
Tender drawings documentation in softcopy .dwfx the tenderers to any additional payment and time whenever the tenderers
are instructed to design, build, or install such facilities.
1.3.10 The successful tenderer shall conduct an assessment using the green 2.5 The detailed scope of works for other facilities and services, wherever
rating tools to evaluate the level of sustainability achieved for the project in applicable, shall be as mentioned in other relevant works and technical brief
accordance with Surat Arahan KPKR Bil.2/2020: Pelaksanaan Penarafan of requirements in the pre-bid document.
Hijau Bagi Projek Jabatan Kerja Raya Malaysia (JKR) and Garis Panduan
Pelaksanaan Penarafan Hijau bagi Projek-projek JKR by Cawangan Alam
Sekitar & Kecekapan Tenaga (CASKT).
4 5
2021 EDITION HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT