Page 14 - JKR HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT 2021 EDITION_Neat
P. 14

SECTION 1.0 – GENERAL                                                       SECTION 2.0 – SCOPE OF WORK



 1.3.6   All consultants must be registered with MOF and their respective boards as   SECTION 2.0: SCOPE OF WORKS
 required by the Government.

 1.3.7   The tenderers shall submit copies of a valid certificate of registration that   2.1   The architectural works shall consist of design, planning, preparation,
 indicates the name and registration date with curriculum vitae (CV) of all   production  of  drawings,  and  specifications.   The  subsequent
 appointed consultants.           implementation,  construction (including supervision by qualified
                                  professionals),  completion,  commissioning,  handing-over  in  approved
 1.3.8   The successful tenderer shall include in the submission  of  the  Letter of   condition,  and  maintenance  of  the  said  project  shall  consist  of,  but  not
 Intent (LOI), the Memorandum of Agreement (MOA) between the tenderer   limited to the following components as specified in Appendix 1 - Project
 and consultants (Architect and Medical Planner), and Terms of Reference   Brief.
 (TOR) of each consultant to the government satisfaction.
                        2.2       The detailed requirements for Building Works shall be laid out in the Project
 1.3.9   Where  it  is required for  Building Information Modelling (BIM), the BIM   Brief. The requirements given shall be indicative, and the tenderers shall
 models shall be provided in accordance with the Government’s Technical   include suggestions or improvements to their proposals.
 Requirements, Garis Panduan BIM JKR and Piawaian BIM JKR, unless
 otherwise specified in the BIM Project Execution Plan (BPEP) and subject   2.3   All information provided in the pre-bid document shall be intended to assist
 to the P.D.’s acceptance, minimum as follows:   the tenderers in the design and shall not be read as the only features or
                                  facilities  required  and/or  constrained  to  the  design.  The  tenderers  shall
 ITEM   FORMAT                    understand each area’s intended purposes and functions  to satisfy the
                                  Government’s requirements.
 Outline of BIM Project Execution Plan (BPEP)   .pdf/ .doc

 Coordinated Design Architectural BIM Model   .rvt & .nwc   2.4   The tenderers shall also be responsible with providing a complete design
 Spatial Analysis Report based on Architectural Model   .pdf   and building facilities for each area’s proper function and efficient operation.
                                  The tenderers’ failure to comply with the said requirement shall not entitle
 Tender drawings documentation in softcopy   .dwfx   the tenderers to any additional payment and time whenever the tenderers
                                  are instructed to design, build, or install such facilities.

 1.3.10   The successful tenderer shall conduct an assessment using the green   2.5   The detailed scope of  works for other  facilities and services,  wherever
 rating tools to evaluate the level of sustainability achieved for the project in   applicable, shall be as mentioned in other relevant works and technical brief
 accordance with Surat Arahan KPKR Bil.2/2020: Pelaksanaan Penarafan   of requirements in the pre-bid document.
 Hijau Bagi Projek Jabatan Kerja Raya Malaysia (JKR) and Garis Panduan
 Pelaksanaan Penarafan Hijau bagi Projek-projek JKR by Cawangan Alam
 Sekitar & Kecekapan Tenaga (CASKT).


























 4                                                                                                       5
 2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT   2021 EDITION                                          HEALTH FACILITY ARCHITECTURAL NEEDS STATEMENT