The City & Guilds Textbook: Plumbing Book 1
Test your knowledge
1 In line with the Construction (Design and Management) Regulations
2015, a construction project is notifiable when:
a The project lasts more than 500 days and involves 30 or more
operatives
b The project involves 500 or more person-days or lasts more than 30 days
c The site includes three or more trades at any one time
d The client is classified as a ‘non-domestic client’
2 Which member of the site management team advises on how a project
can be constructed within the client’s financial budget?
a The building surveyor
b The estimator
c The clerk of works
d The quantity surveyor
3 Which of the following is the Building Control Inspector employed by?
a The HSE
b The local authority
c The client
d The main contractor
4 As a plumber working on a large domestic new-build project, which
document would be consulted to confirm the type and quality of terminal
fittings to be installed?
a The specification
b The work programme
c Working drawings
d Variation orders
5 Which of the following tasks is classed as ‘first fix’?
a Installing traps to wash hand basins
b Installing flexible connectors to terminal fittings
c Hanging radiators on finished walls
d Notching joists to install heating pipework
6 Which of the following is the main role of the clerk of works?
a To ensure that all work by contractors is completed in line with agreed
plans and relevant standards on behalf of the client
b To quantify the materials required for the installation and order as
required
c To oversee the craft operatives on-site and plan the daily activities
d To manage the finances of the project, including materials and labour,
ensuring the project is completed within budget