Chapter 9 Sanitation systems
2 Replace the WC first: if the bathroom layout is being altered, with the WC
occupying a new position, this will obviously be the only option as the soil
stack connection will need to be altered before the bathroom installation
can begin. It is pointless installing the original WC on a new soil stack as this
wastes precious installation time.
In both cases, the soil pipe to the WC should be blanked off (temporarily
capped) when there is no WC fitted. This will prevent obnoxious smells from
entering the working area. This can be done by the temporary use of a drain
plug or PVCu cap end.
Once the bathroom suite has been installed, we can think about testing the
sanitary pipework.
Jointing methods used in sanitary INDUSTRY TIP
appliances pipework systems
The fixing details for polypropylene and PVCu (ABS and MuPVC) are covered in A full range of fittings
are available for both
Chapter 2, Common processes and techniques, page 113–17. polypropylene and PVCu, and
some of these are looked
ACTIVITY at in Chapter 2, Common
Soil and waste fittings processes and techniques. It
may be a good idea to keep a
For more information on soil and waste pipe and fittings, revisit Chapter 2, fittings catalogue handy when
Common processes and techniques, or check out the manufacturers’ literature. working on-site so that you
Most manufacturers produce fittings catalogues and these are available
from your local plumbers’ merchant or by downloading as pdf files from the are aware of the full range of
manufacturers’ websites. Check out the following websites: fittings available.
● www.hunterplastics.co.uk
● www.wavin.com/en-gb/Catalog/Potable-Water/Plumbing-Systems/Push-fit-
Hep2O
● www.osma.co.uk
● www.marley.co.uk
● www.polypipe.com
605
9781510416482.indb 605 29/03/19 9:08 PM