Page 25 - PowerPoint Presentation
P. 25

c
                 A
                   Rev.
                   Date
                 29.11.18
                                                                                                                                                           Equipment. Any variations must be brought to the
                                                                                                                                                              this company.  A charge may be levied.
                                                                                                                                                          attention of Advance Catering Equipment immediately.
                                                                                                                                                             All dimensions shown on this drawing are the required
                                                                                                                                                            minimum finished wall dimensions by Advance Catering
                                                                                                                                                              whole or part without the prior written consent of
                                                                                                                                                                This drawing is the property of The Advance Group
                                                                                                                                                               and must not be copied or passed to a third party in
                   Description
                                                                                                                           Operation:
                 Amended following site meeting
                                                                                                                                                           GAS
                                                                                                                                                           TM
                                                                                                                                                         REGISTER
                                                                                                                                                          safe
                                                                              replenishment.
                                                                                                                                   CHIPS
                                                                                                                                                          point.
                                                                                                                                                                 Electrical:
                                                                                                                                                             Mechanical:
                                                                                                                                                              Wiring Regulations.
                                                                                                                                                       on the day of installation.
                                                                                                                  the back bottle coolers
                                                                                                  topping replenishment.
                                                                                                                                                         Extraction/Ventilation:
                                                                                              4 - Hot toppings display
                                                                                          5 - Thermodyne for chips
                                                                                                                                             PROPOSED LAYOUT
                                                                                  7 - Chilled topping fridge for
                                                                                      6 - Chilled toppings / sauces
                                                                                                                                                           pipe and suitably bracketed to floor with gas cocks to each connection
                                                                                                                      1 - Till / Drink - replenish from
                                                                                                      dump, hot cupboard under for
                                                                                                              2 - Packaging storage/display
                                                                                                                                                               by the electrical contractor. It is the electrical contractors responsibility to
                                                                                                                                                           Paragraph 6.2. Gas manifold within the cooking suite must be run in iron
                                                                                                                                                               to ensure that all electrical services comply with the I.E.E. 17th Edition Of
                                                                                                                                                             Advance Catering Equipment will only terminate to services above finished
                                                                                                                                                                All earthbonding & positioning of general purpose sockets to be undertaken
                                                                                                                                                            floor level. Gas services to be in accordance with B.S. 6173:2009 Section 3,
                                                                                                                                                        Electrical connections are NOT included (unless specified) although we have
                                                                                                                                                        included for a speed controller. An electrician would need to be in attendance
                                                                                                          3 - Bespoke glass fronted chip
                                                                                                                                                          Gas:
                                                                                                                                                                 Water:
                 GF
                   By
                                                                                                                                                            from freezing.
                                                                                                                                                           Hot Water Pressure:
                                                                                                                                                               Cold Water Pressure:
                                                                                                                                                       extract is switched on.
                                                                                                                                                              boosting set is supplied.
                                                                                                                                                             Hot Water Temperature:
                   Rev.
                                                                                                                                                           Minimum of 2.0 Bar and a Maximum of 4.0 Bar.
                                                                                                                                                               Minimum of 1.5 Bar and a Maximum of 4.0 Bar.
                   Date
                                                                                                                                                            Hot water is to be between 50° and 60°C and is to be protected
                                                                                                                                                              If the water pressure is below 1.5 Bar we recommend that a pressure
                                                                                                                                                        system to ensure that the gas supply can not be live unless the kitchen
                                                                                                                                                        to the kitchen gas supply that is linked to the kitchen extract ventilation
                                                                                                                                                                Mains cold water to be used on ALL appliances in kitchen and bar areas.
                                                                                                                                                         It is recommended that an automatic isolation valve system shall be fitted
                   Description
                                                                                                                                                                 General:
                                                                                                                                                            contractor).
                                                                                                                                                          Other Builders Notes.
                                                                                                                                                         1000mm clear door opening.
                                                                                                          5.07
                                                                                                                        5.08
                           6.06
                                                                             5.05
                                                       5.03
                                                                                                                                                       for the running of pipe runs for the cold rooms.
                                                                 5.04
                                                                                                                                                          All access doors require a 1100mm structual opening with
                                                                                                                                                        Where applicable, a concrete plinth will be required for floor
                                                                                                                                                           wall through the sink upsatnd with mirrored domed head screws.
                                                                                                                                                        mounted compressors to cold rooms. Duct routes will be required
                                                                                                                                                             cocks, stop taps, ball A valves and isolators to be provided by main
                                                                                                                                   6
                                                                                                                                                              catering equipment to be by catering contractor and to be made from
                                                                                                                  4
                                                                                                                                                               any equipment that is pushed flush against the wall. Final connection to
                                                                                                                                                            ALL sink units are to be mastic sealed to the wall and screw fixed to the
                                                                                                                                                              suitably isolated supplies as indicated on our service points drawing (Gas
                                                                                                                                                               A.F.F.L. Where this is unavoidable they should be routed to avoid fouling
                                                                                                                                                                All surface mounted pipe & conduit runs must be no higher than 750mm
                                                                                        3
                                                                 1
                                                                                                                           5.11
                                                                                                               5
                                                                                                                                   5.12
                   By
                                                          2
                                                                                                                       5.10
                                                                                                                               7
                                                5.01
                                                                                       5.06
                                                                                                             5.09
                                                                 5.02
                                                                                                         5.09a
          Signed:.....................................
         Print:..................... Date:..........
             NOT TO BE ISSUED
                  NON-APPROVED DESIGN
                FOR DISCUSSION ONLY
                  Scale:
                Drawn By:
             Consultant:
          Project Manager:
                  1:20 @A3
                Stephanie Pettengell
                                              6.02
                   Client:
              Project:
          Drawing No:
          PD - 18301 - 05 A
          Date:
             Highbury Food Kiosks - Chips
          22.10.18
                                                                                                                                                              5.02
                                                                                                                                                                5.01
                                                                                                                                            5.12
                                                                                                                                                      5.07
                                                                                                                                                        5.06
                                                                                                                                                    5.08
                                                                                                                                             5.11
                                                                                                                                               5.10
                                                                                                                                                  5.09
                                                                                                                                                             5.03
                                                                                                                                                           5.04
                                                                                                                                                         5.05
                                                                                                                                                 5.09a
                 Arsenal Emirates Stadium
                                                                                                                                                              Tills station
                                                                                                                                            Salad Display
                                                                                                                                                      1-Light Heat Lamp
                                                                                                                                                                Double Bin section
                                                                                                                                                    1-Light Heat Lamp
                                                                                                                                                         Front counter screen
                                                                                                                                                 300 Thermodyne dolly
                                                                                                                                                             Front shopfitted counter
                                                                                                                                                        Bespoke Heated Chip Dump
                                                                                                                                               Refrigerator/Freezer multi temp
                                                                                                                                                  5 Shelf Counter Top Thermodyne
                                                                                                                                             Multipoint induction warming plate
                                                                                                                                                           Stainless steel contact cooled chill well
         Website: www.advancecatering.co.uk
          Tel: (01582) 813900  Fax: (01582) 813901 E-mail: design@advance-catering.co.uk
            Delivering Innovation, Providing Peace of Mind
                                                                                                                                                               By Others
                                                                                                                                                             By Others
           Dantom House, Blackburn Road, Houghton Regis, Dunstable. LU5 5BQ
   20   21   22   23   24   25   26   27   28   29