Page 26 - PowerPoint Presentation
P. 26

c


                   A
                     Rev.
                     Date
                   29.11.18
                                                                                                                                                        Equipment. Any variations must be brought to the
                                                                                                                                                           this company.  A charge may be levied.
                                                                                                                                                        attention of Advance Catering Equipment immediately.
                                                                                                                                                          All dimensions shown on this drawing are the required
                                                                                                                                                         minimum finished wall dimensions by Advance Catering
                                                                                                                                                            whole or part without the prior written consent of
                                                                                                                                                             This drawing is the property of The Advance Group
                                                                                                                                                             and must not be copied or passed to a third party in
                     Description
                   Amended following site meeting
                                                                                                                                                        GAS
                                                                                                                                                        safe
                                                                                                                                                        TM
                                                                                                                                                       REGISTER
                                                                                                     8.12
                                                                             DDA &
                                                                                                                                                        point.
                                                                                                                                                              Electrical:
                                                                                                                                                           Mechanical:
                                                                                                                                                            Wiring Regulations.
                                                                                                                                                     on the day of installation.
                                                                                                                                                       Extraction/Ventilation:
                                                                          Collection Point
                                                                                                               8.11
                                                                                                                                           PROPOSED LAYOUT
                                                                                                                                                        pipe and suitably bracketed to floor with gas cocks to each connection
                                                                                                                                                         Paragraph 6.2. Gas manifold within the cooking suite must be run in iron
                                                                                                                                                             by the electrical contractor. It is the electrical contractors responsibility to
                                                                                                                                                            to ensure that all electrical services comply with the I.E.E. 17th Edition Of
                                                                                                                                                          Advance Catering Equipment will only terminate to services above finished
                                                                                                                                                             All earthbonding & positioning of general purpose sockets to be undertaken
                                                                                                                                                      Electrical connections are NOT included (unless specified) although we have
                                                                                                                                                         floor level. Gas services to be in accordance with B.S. 6173:2009 Section 3,
                                                                                                                                                     included for a speed controller. An electrician would need to be in attendance
                                                                                                          8.10
                                                                                          7.03
                                                                                                                                                       Gas:
                   GF
                                                                                                                                                              Water:
                     By
                                                                                                                                                         from freezing.
                                                                                                                                                         Hot Water Pressure:
                                                                                                                                                             Cold Water Pressure:
                                                                                                                                                     extract is switched on.
                                                                                                                                                           boosting set is supplied.
                                                                                                                                                          Hot Water Temperature:
                                                                                                         8.09
                     Rev.
                                                                                                                                                            Minimum of 1.5 Bar and a Maximum of 4.0 Bar.
                                                                                                                                                        Minimum of 2.0 Bar and a Maximum of 4.0 Bar.
                     Date
                                                                                                                                                          Hot water is to be between 50° and 60°C and is to be protected
                                                                                                                                                            If the water pressure is below 1.5 Bar we recommend that a pressure
                                                                                                                                                     system to ensure that the gas supply can not be live unless the kitchen
                                                                                                                                                      to the kitchen gas supply that is linked to the kitchen extract ventilation
                                                                                                                                                             Mains cold water to be used on ALL appliances in kitchen and bar areas.
                                                                                                                                                       It is recommended that an automatic isolation valve system shall be fitted
                                                                                          7.03
                     Description
                                                                                                                                                              General:
                                                                                                                                                          contractor).
                                                                                                               8.08
                                                                                                                                                        Other Builders Notes.
                                                                                                                                                       1000mm clear door opening.
                                                                    7.01
                                                                                                                                                     for the running of pipe runs for the cold rooms.
                                                                                                                                                       All access doors require a 1100mm structual opening with
                                                                                                                                                      Where applicable, a concrete plinth will be required for floor
                                                                                                                                                         wall through the sink upsatnd with mirrored domed head screws.
                                                                                                                                                           cocks, stop taps, ball A valves and isolators to be provided by main
                                                                                                                                                     mounted compressors to cold rooms. Duct routes will be required
                                                                                                                                                            catering equipment to be by catering contractor and to be made from
                                                                                                                                                         ALL sink units are to be mastic sealed to the wall and screw fixed to the
                                                                                                          8.07
                                                                                                                                                            any equipment that is pushed flush against the wall. Final connection to
                                                                                                                                                           suitably isolated supplies as indicated on our service points drawing (Gas
                                                                                                                                                             All surface mounted pipe & conduit runs must be no higher than 750mm
                                                                                                                                                             A.F.F.L. Where this is unavoidable they should be routed to avoid fouling
                                                                                                 8.13
                                                                                                           8.06
                                                                                        7.02
                                                                                                     8.05
                     By
                                                                                        7.04
                                                                                                       8.04
                                                                                                       8.04
             Signed:.....................................
                                                                                                      8.03
            Print:..................... Date:..........
                    NON-APPROVED DESIGN
               NOT TO BE ISSUED
                  FOR DISCUSSION ONLY
                     Scale:
                  Drawn By:
               Consultant:
                                                                                                     8.02
             Project Manager:
                  GF
                     A2 @ 1/20
                                                                            8.01
                     Client:
                Project:
             Drawing No:
             PD - 18323 - 01 A
               Highbury - Coffee station
             Date:
             12.11.18
                   Arsenal Emirates FC
                                                                                                                                                        7.02
                                                                                                                                                          7.01
                                                                                                                                            8.05
                                                                                                                                  8.11
                                                                                                                                             8.04
                                                                                                                                                8.02
                                                                                                                                               8.03
                                                                                                                                     8.09
                                                                                                                                    8.10
                                                                                                                                       8.08
                                                                                                                                          8.06
                                                                                                                                         8.07
                                                                                                                                                     7.03
                                                                                                                               8.13
                                                                                                                                                   7.04
                                                                                                                                 8.12
                                                                                                                                                       7.03
                                                                                                                                                  8.01
                                                                                                                                                           Key
                                                                                                                                                     Tills station
                                                                                                                                                       Tills station
                                                                                                                                       E71 Two group
                                                                                                                                  E71 Two group
                                                                                                                               Frame for bar top
                                                                                                                                                  Rear Coffee counter
                                                                                                                                               Rapid Rinser ( V134 )
                                                                                                                                            Undercounter Freezer
                                                                                                                                     FilterFlow Water Boiler
                                                                                                                                          Hot Chocolate machine
                                                                                                                                 Refridgerator, Undercounter
                                                                                                                                                Refridgerator, Undercounter
                                                                                                                                                   Kubus self help cold tiered unit
                                                                                                                                                        Kubus self help cold tiered unit
           Website: www.advancecatering.co.uk
                                                                                                                                         Mazzer Super Jolly Coffee Grinder
                                                                                                                                    Mazzer Super Jolly Coffee Grinder
                                                                                                                                                          Front coffee counter and understructure
                                                                                                                                             Blendtec EZ600 Commercial Blender  (x2)
            Tel: (01582) 813900  Fax: (01582) 813901 E-mail: design@advance-catering.co.uk
               Delivering Innovation, Providing Peace of Mind
             Dantom House, Blackburn Road, Houghton Regis, Dunstable. LU5 5BQ
                                                                                                                                       By Others
                                                                                                                                    By Others
                                                                                                                                  By Others
                                                                                                                                                     By Others
                                                                                                                                                       By Others
                                                                                                                                                          By Others
                                                                                                                                         By Others
                                                                                                                                          By Others
                                                                                                                                                  By Others
   21   22   23   24   25   26   27   28   29