Equipment Maintenance


                 a.  PURPOSE

                      The purpose of this procedure is to ensure that company owned construction equipment
                      is maintained in a satisfactory condition so as to enable it to function as required when
                      required and facilitate continued production.

                 b.  SCOPE OF APPLICATION

                      Unless otherwise stated, this procedure applies to all equipment owned by the company
                      that affects quality or production.

                 c.  DEFINITIONS
                      None

                 d.  CROSS REFERENCE
                           Quality Manual (Clause  d.9)

                 e.  RESPONSIBILITY FOR APPLICATION
                     Workshop in charge is responsible for the application of this procedure.

                 f.  PROCESS
                     f.1   Preventive Maintenance

                           f.1.1  Workshop  in  Charge  prepares  a  preventive maintenance  programme
                                  covering all machines, plants, equipment used for construction purposes.
                           f.1.2  Preventive  maintenance  activities  will  be  performed  by  experienced
                                  Mechanics or by external workshops (sub-contractor).
                           f.1.3  The maintenance will be performed as per the programme. A Maximum
                                  one week will be allowed to depart from the programme depending on
                                  availability of the machine and release from relevant site.
                           f.1.4  All operatives are required to carry out daily visual checks on equipment.
                                  For Mechanical items this should include fluid levels and greases and any
                                  “topping-up”  undertaken  where  required.  Where  problems or  potential
                                  problems are identified on site this should be brought to the attention of
                                  the Project Engineer / Workshop In Charge for action.
                           f.1.5  The maintenance In Charge will arrange to perform the maintenance and
                                  update machine records and programme accordingly.

                    f.2    Breakdown Maintenance

                            f.2.1 The  Project  Engineer  shall  requisition  attendance  to  breakdowns  of
                                  equipment  owned  by  the  company in  the  same  way  that  preventive
                                  maintenance is requisitioned. Where the equipment has been hired from
                                  outside the Project Engineer shall contact the supplier direct to request
                                  attendance.